Cabling 97
o
Secure the secondary PCIe riser cage full-length expansion board retainer (on page
33
).
17.
Install the access panel (on page
25
).
18.
Install the server in the rack ("
Installing the server into the rack
" on page
40
).
19.
Remove any installed hard drives ("
Removing a hot-plug SAS or SATA hard drive
" on page
60
).
20.
Install a SATA hard drive ("
Installing a hot-plug SAS or SATA hard drive
" on page
59
) in hard drive bay
5.
21.
Install hard drive blanks in any empty hard drive bays.
22.
Connect each power cord to the server.
23.
Connect each power cord to the power source.
24.
Power up the server (on page
23
).
25.
Use RBSU ("
HP ROM-Based Setup Utility
" on page
103
) to disable the embedded HP Smart Array
P420i Controller, if necessary.
150W PCIe power cable option
CAUTION:
To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCI expansion cage.
Connect the cable as indicated.
Содержание ProLiant DL385p Gen8
Страница 6: ...Contents 6 Documentation feedback 132 Index 133 ...
Страница 51: ...Hardware options installation 51 19 Install the air baffle 20 Install the primary PCIe riser cage ...
Страница 65: ...Hardware options installation 65 o 8 or 16 drive SFF o 8 drive LFF ...
Страница 90: ...Cabling 90 Cabling SAS hard drive cabling SFF hard drive cabling SFF cabling with optional drive cage ...
Страница 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Страница 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Страница 127: ...Support and other resources 127 ...
Страница 128: ...Support and other resources 128 ...