Hardware options installation 108
14.
If you intend to enable power redundancy in the server, install a second power input module in the
power supply bay 2:
a.
Remove the power supply blank.
b.
Install a hot-plug power input module in the power supply bay 2.
15.
Install the HP Smart Storage Battery holder.
16.
If removed, install the secondary PCI riser cage ("
Install the PCI riser cages
" on page
28
).
17.
Install the access panel (on page
26
).
18.
Install the server into the rack ("
Installing the server into the rack
" on page
36
).
19.
Connect the power cords to the power supplies.
20.
To prevent accidental power cord disconnection when sliding the server in and out of the rack, secure
the power cord in the hook-and-loop strap attached to the power input module handle:
a.
Unwrap the hook-and-loop strap from the power input module handle.
CAUTION:
Avoid tight bend radii to prevent damaging the internal wires of a power cord or a
server cable. Never bend power cords and server cables tight enough to cause a crease in the
sheathing.
Содержание ProLiant DL180 Gen9
Страница 77: ...Hardware options installation 77 6 Remove the HP Universal Media Bay blank 7 Install the optical drive cage ...
Страница 122: ...Cabling 122 Item Description 5 Fan 5 cable GPU power drive cabling FlexibleLOM sideband signal cabling ...
Страница 126: ...Cabling 126 Item Description 3 USB 3 0 connector cable ...
Страница 157: ...Support and other resources 157 ...
Страница 158: ...Support and other resources 158 ...
Страница 169: ...Index 169 W warnings 34 35 warranty information 147 website HP 151 weight 149 ...