Hardware options installation 42
12.
Install the redundant power supply cage.
13.
Install the system board.
14.
Connect all cables previously disconnected from the system board.
15.
Route and connect power cables to the system board and the front drive cage.
16.
Install the PCIe riser cage (on page
19
).
17.
Install the air baffle (on page
20
).
18.
Install the foam air baffle from the option kit:
IMPORTANT:
Two foam air baffles are provided in the option kit. The shorter foam air baffle is
designed to be installed in servers with a four-bay LFF drive cage configuration. The longer foam
air baffle is designed to be installed in servers with an eight-bay SFF drive cage configuration.
Depending on the server configuration, be sure to install the correct foam air baffle.
o
Foam air baffle for a four-bay LFF drive cage
Содержание ProLiant DL120 G7
Страница 21: ...Operations 21 2 Install the access panel on page 18 3 Power up the server on page 17 ...
Страница 41: ...Hardware options installation 41 10 Remove the rear bracket 11 Remove the ATX power supply ...
Страница 49: ...Cabling 49 RPS cabling Internal USB cabling ...
Страница 51: ...Cabling 51 ODD cabling SATA cabling LFF model ...
Страница 52: ...Cabling 52 SFF model SAS cabling LFF model ...
Страница 53: ...Cabling 53 SFF model ...
Страница 74: ...Troubleshooting 74 ...
Страница 97: ...Support and other resources 97 ...
Страница 98: ...Support and other resources 98 ...
Страница 101: ...Acronyms and abbreviations 101 UID unit identification USB universal serial bus VCA Version Control Agent ...