Hardware options installation 40
8.
Install the battery pack.
9.
Route the cable ("
BBWC battery cabling
" on page
50
).
10.
Install the PCIe riser cage (on page
19
).
11.
Install the access panel (on page
18
).
12.
Install the server into the rack ("
Installing the server into the rack
" on page
25
).
13.
Power up the server (on page
17
).
Redundant hot-plug power supply option (with cage)
To install the component:
1.
Power down the server (on page
17
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Remove the server from the rack (on page
17
).
4.
Remove the access panel (on page
18
).
5.
Remove the air baffle (on page
19
).
6.
Remove the PCIe riser cage (on page
18
).
7.
Disconnect any power cables connected to the front drive cage.
8.
Remove all cables connected to the system board.
9.
Remove the system board.
Содержание ProLiant DL120 G7
Страница 21: ...Operations 21 2 Install the access panel on page 18 3 Power up the server on page 17 ...
Страница 41: ...Hardware options installation 41 10 Remove the rear bracket 11 Remove the ATX power supply ...
Страница 49: ...Cabling 49 RPS cabling Internal USB cabling ...
Страница 51: ...Cabling 51 ODD cabling SATA cabling LFF model ...
Страница 52: ...Cabling 52 SFF model SAS cabling LFF model ...
Страница 53: ...Cabling 53 SFF model ...
Страница 74: ...Troubleshooting 74 ...
Страница 97: ...Support and other resources 97 ...
Страница 98: ...Support and other resources 98 ...
Страница 101: ...Acronyms and abbreviations 101 UID unit identification USB universal serial bus VCA Version Control Agent ...