Installing the Switch
Installation Procedures
In
s
ta
lling the S
w
it
c
h
Figure 2-1. Air flow direction of the 2910al switch
Installation Procedures
Summary
1.
Prepare the installation site
(
page 2-5
). Ensure the physical environ-
ment is properly prepared, including having the correct network cabling
ready to connect to the switch and having an appropriate location for the
switch. See
page 2-3
for some installation precautions.
2.
Verify the switch passes self test
(
page 2-5
). Plug the switch into a
power source and observe that the LEDs on the switch’s front panel
indicate correct switch operation. When self test is complete, unplug the
switch.
3.
(Optional)
Install a module
(
page 2-8
).
4.
Mount the switch
(
page 2-11
). The Switch can be mounted in a 19-inch
telco rack, in an equipment cabinet, or on a horizontal surface.
5.
(Optional) Install a transceiver
(
page 2-14
). If you have installed a
module, you can now install one or two transceivers.
6.
(Optional) Install mini-GBICs and SFPs
(
page 2-16
). The switch has
four slots for installing mini-GBICs. Depending on where you will mount
the switch, it may be easier to install the mini-GBICs first. Mini-GBICs can
be installed or removed while the switch is powered on.
7.
Connect power to the switch
(
page 2-18
). Once the switch is mounted,
plug it into the nearby main power source.
Содержание J9146A - ProCurve Switch 2910al-24G-PoE
Страница 1: ...Power over Ethernet ProCurve 2910al Switches Installation and Getting Started Guide ...
Страница 2: ......
Страница 3: ...ProCurve 2910al Switches Installation and Getting Started Guide ...
Страница 26: ......
Страница 80: ......
Страница 82: ......
Страница 92: ......
Страница 101: ...D 9 Safety and EMC Regulatory Statements EMC Regulatory Statements Safety and EMC Regulatory Statements Korea Taiwan ...
Страница 104: ......
Страница 114: ...6 Index Index ...
Страница 115: ......