Chapter 2
Installing the Server
Lifting the Server Cabinet Manually
50
Step 6.
Align the screw holes in the handle’s front flange with the rack mounting holes in the server’s rack
mount flange. Secure with the two thumbscrews. See Figure 2-6 on page 50.
Figure 2-6 Attaching the Front of Handle to Chassis
Step 7.
Repeat steps 2—4 to install the other handle on the other side of the server.
Step 8.
After handles are secured, server is ready to lift.
Step 9.
Handles are removed in reverse order of steps 2—4.
Step 10.
After moving the server, remove the lift handles from the chassis.
Step 11.
After the server is secured, replace the previously removed cell boards and bulk power supplies.
Step 12.
Reinstall the side covers and front bezel.
Thumbscrews
Содержание Integrity rx7640
Страница 4: ...Contents 4 ...
Страница 5: ...Contents 5 ...
Страница 6: ...Contents 6 ...
Страница 7: ...Contents 7 ...
Страница 8: ...Contents 8 ...
Страница 10: ...Tables 10 ...
Страница 13: ...Figures 13 ...
Страница 14: ...Figures 14 ...
Страница 40: ...Chapter 1 HP Integrity rx7640 Server and HP 9000 rp7440 Server Overview Detailed Server Description 40 ...
Страница 101: ...Index 101 ...