Chapter 2
Installing the Server
Cabling and Power Up
96
Unpack SPU cabinet
Allow proper clearance
Cut polystrap bands
Remove cardboard top cap
Remove corrugated wrap
from the pallet
Remove four bolts holding
down the ramps and
remove the ramps
Remove antistatic bag
Check for damage (exterior
and interior)
Position ramps
Roll cabinet off ramp
Unpack the peripheral
cabinet (if ordered)
Unpack other equipment
Remove and dispose of
packaging material
Move cabinet(s) and
equipment to computer room
Move cabinets into final
position
Position cabinets next to
each other (approximately
1/2 inch)
Adjust leveling feet
Install anti-tip plates
Inspect cables for proper
installation
Set up CE tool and connect to
Remote RS-232 port on MP
Apply power to cabinet
(Housekeeping)
Check power to BPSs
Log in to MP
Set LAN IP address on MP
Table 2-5
Factory-Integrated Installation Checklist (Continued) (Continued)
Procedure
In-process
Completed
Содержание Integrity rx7640
Страница 4: ...Contents 4 ...
Страница 5: ...Contents 5 ...
Страница 6: ...Contents 6 ...
Страница 7: ...Contents 7 ...
Страница 8: ...Contents 8 ...
Страница 10: ...Tables 10 ...
Страница 13: ...Figures 13 ...
Страница 14: ...Figures 14 ...
Страница 40: ...Chapter 1 HP Integrity rx7640 Server and HP 9000 rp7440 Server Overview Detailed Server Description 40 ...
Страница 101: ...Index 101 ...