Chapter 2
Installing the Server
Lifting the Server Cabinet Manually
48
Lifting the Server Cabinet Manually
Use this procedure only if no HP approved lift is available.
CAUTION
This procedure must only be performed by four qualified HP Service Personnel utilizing proper
lifting techniques and procedures.
CAUTION
Observe all electrostatic discharge (ESD) safety precautions before attempting this procedure.
Failure to follow ESD safety precautions can result in damage to the server.
Step 1.
Follow the instructions on the outside of the service packaging to remove the banding and
cardboard top from the server pallet.
Step 2.
Reduce the weight by removing the bulk power supplies and cell boards. Place each on an ESD
approved surface.
CAUTION
System damage can occur through improper removal and reinstallation of bulk
power supplies and cell boards.
Step 3.
Remove the systems left and right side covers.
NOTE
The latest lift handles available for the 2-cell servers are symmetrical and can be
installed on either side of the server.
Step 4.
Locate one handle and ensure the two thumbscrews are removed from its front flange.
Содержание Integrity rx7640
Страница 4: ...Contents 4 ...
Страница 5: ...Contents 5 ...
Страница 6: ...Contents 6 ...
Страница 7: ...Contents 7 ...
Страница 8: ...Contents 8 ...
Страница 10: ...Tables 10 ...
Страница 13: ...Figures 13 ...
Страница 14: ...Figures 14 ...
Страница 40: ...Chapter 1 HP Integrity rx7640 Server and HP 9000 rp7440 Server Overview Detailed Server Description 40 ...
Страница 101: ...Index 101 ...