12
Rack-mounting by using front and rear mounting brackets
(HPE 5510 24G PoE+ 4SFP+ HI and HPE 5510 48G PoE+
4SFP+ HI)
This mounting method is applicable to only the HPE 5510 24G PoE+ 4SFP+ HI and HPE 5510 48G
PoE+ 4SFP+ HI switches. You can install the front mounting brackets at the port-side or power-side
mounting position as needed. The following takes port-side mounting as an example. The
power-side mounting is similar.
This task requires two people.
To install the switch in a 19-inch rack by using the front and rear mounting brackets:
1.
Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded.
2.
Attach the front mounting brackets and load-bearing screws to the chassis:
a.
Unpack the front mounting brackets and the M4 screws for attaching the brackets to the
switch chassis.
b.
Align the round holes in the wide flange of one front mounting bracket with the screw holes
in the port-side mounting position on one side of the chassis (see
c.
Use M4 screws (supplied with the switch) to attach the mounting bracket to the chassis.
d.
Repeat the proceeding two steps to attach the other mounting bracket to the chassis.
e.
Unpack the load-bearing screws.
f.
Install the load-bearing screws in one of the load-bearing screw mounting positions on both
sides of the chassis (see
).
Figure 12 Attaching the front mounting brackets and load-bearing screws to the chassis
3.
Attach the rear mounting brackets to the rack:
a.
Unpack the rear mounting brackets.
b.
Install cage nuts (user-supplied) in the mounting holes in the rear rack posts.
c.
Attach the rear mounting brackets to the rear posts with M6 screws (user supplied), as
shown in
and
Do not fully tighten the M6 screws before mounting the switch in the rack.
Содержание flexnetwork 5510 hi series
Страница 5: ...iii Index 72 ...
Страница 42: ...37 Figure 41 Connecting the switches in one rack ...