If
not
already
installed,
install
a
HP
PCI
Express
Mezzanine
Pass-Thru
Card
in
mezzanine
3
connector
in
the
server
blade.
See
the
documentation
that
ships
with
the
mezzanine
card
and
the
server
blade
documentation
for
more
information.
3.
Remove
the
blank
from
the
device
bay.
Squeeze
in
the
release
tabs
(1)
and
pull
the
blank
away
from
the
assembly
(2).
Figure
11
Removing
the
blank
4.
c7000
enclosures
only:
lnstall
the
supplied
coupler
plate.
(This
allows
you
to
install
a
separate
device
in
the
upper
bay
above
the
tape
blade,
if
required.)
Align
the
slots,
as
illustrated,
and
slide
forward
to
lock
into
place.
Figure
12
Installing
the
coupler
plate
NOTE:
If
you
need
to
return
the
tape
blade
for
service,
you
must
fi
rst
remove
the
coupler
plate.
See
“
Remove
the
coupler
plate
” on page 58 for
further details.
NOTE:
c3000
enclosures
require
a
mini
divider.
This
is
supplied
with
the
enclosure.
Refer
to
the
documentation
provided
with
the
enclosure
for
installation
instructions.
26
Installing
an
HP
StorageWorks
Tape
Blade
Содержание EH920A - StorageWorks Ultrium 1760 Tape Drive
Страница 1: ...HP StorageWorks Tape Blade User Guide Part number 509508 001 Third edition October 2008 ...
Страница 8: ...8 ...
Страница 12: ...12 About this guide ...
Страница 16: ...16 Before you start ...
Страница 38: ...38 Loading and unloading cartridges and removing tape blade ...
Страница 44: ...44 Use the correct media ...
Страница 48: ...48 Using HP OBDR ...
Страница 64: ...64 Replacing a tape blade chassis or tape drive ...