
Operation
Verification
Tests
Operation verification tests objectives are to instill a high degree of
confidence that the HP E1328A 4-Channel D/A Converter is meeting
selected specifications from those listed in Appendix A - Specifications in
the HP E1328A User’s Manual.
Operation verification tests can be used in applications such as incoming
inspection and after HP E1328A repair. To perform operation verification
tests, do the parts of the performance verification tests shown in Table 4-1.
See Performance Verification Tests for details on the test procedures.
NOTE
For best results, perform an ACAL on the HP 3458A multimeter not more
than 24 hours prior to performing the operation verification tests.
If the operation verification test FAILS on any channel, you may want to
perform the Voltage Adjustment and/or Current Adjustment procedures in
Chapter 5 - Adjustments and then rerun the operation verification tests.
Table 4-1. HP E1328A DAC Operation Verification Tests
For this test:
Make these measurements:
Voltage Accuracy
-10V, 0V, +10V
Current Accuracy
-20 mA, 0 mA, +20 mA
28 Verification Tests
Chapter 4
Содержание E1328A
Страница 4: ...Notes 4 Contents HP E1328A Service Manual ...
Страница 46: ...Figure 6 7 HP E1328A DAC Replaceable Parts 46 Replaceable Parts Chapter 6 ...
Страница 48: ...48 Manual Changes Chapter 7 ...
Страница 54: ...54 Service Chapter 8 ...
Страница 60: ...60 Calculating D A Converter Accuracy Appendix A ...