
Hardware options installation 34
7.
Using a T-15 screwdriver, secure the drive to the chassis.
8.
Connect the optical drive and power cable to the optical drive.
9.
Connect the power connector to the power supply backplane.
10.
Install the access panel.
11.
Install the server into the rack.
Expansion board option
To install the component:
1.
Power down the server (on page
15
).
2.
Remove the server from the rack (on page
15
).
3.
Remove the access panel (on page
16
).
4.
Disconnect all internal cables connected to any existing expansion boards.
Содержание DL120 - ProLiant - G5
Страница 46: ...Cabling 46 BBWC battery cabling to an optional controller Power supply 500 W cabling ...
Страница 47: ...Cabling 47 SATA cabling SATA cabling to the SGPIO connector and the 12C cable connector ...
Страница 48: ...Cabling 48 SAS cabling to the SGPIO connector and the 12C cable connector Internal USB cabling ...
Страница 49: ...Cabling 49 Fan cabling ...
Страница 105: ...Technical support 105 ...
Страница 106: ...Technical support 106 ...