Hardware options installation 40
7.
Install the battery pack.
8.
Route the cable.
9.
Install the access panel.
10.
Install the server into the rack.
Installing the FBWC module and capacitor pack
To install the component:
CAUTION:
Do not use this controller with cache modules designed for other controller
models, because the controller can malfunction and you can lose data. Also, do not transfer
this cache module to a different controller module, because you can lose data.
1.
Back up all data.
2.
Close all applications.
3.
Power down the server (on page
15
).
CAUTION:
In systems that use external data storage, be sure that the server is the first unit to
be powered down and the last to be powered back up. Taking this precaution ensures that
the system does not erroneously mark the drives as failed when the server is powered up.
4.
Remove the server from the rack (on page
15
).
5.
Remove the access panel (on page
16
).
6.
Install the storage controller, if not installed ("
Storage controller option
" on page
37
).
Содержание DL100 - ProLiant G2 320GB File Print Appliance
Страница 46: ...Cabling 46 BBWC battery cabling to an optional controller Power supply 500 W cabling ...
Страница 47: ...Cabling 47 SATA cabling SATA cabling to the SGPIO connector and the 12C cable connector ...
Страница 48: ...Cabling 48 SAS cabling to the SGPIO connector and the 12C cable connector Internal USB cabling ...
Страница 49: ...Cabling 49 Fan cabling ...
Страница 107: ...Technical support 107 ...
Страница 108: ...Technical support 108 ...
Страница 112: ...Acronyms and abbreviations 112 UID unit identification USB universal serial bus ...