Hardware options installation 28
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server
unless all bays are populated with either a component or a blank.
3.
Remove the hard drive.
Installing a hot-plug hard drive
IMPORTANT:
Hot-plug capability and drive LED support are only available when a supported
optional controller is installed in the server.
1.
Power down the server (on page
15
).
2.
Remove the existing hard drive blank ("
Removing a hard drive blank
" on page
27
).
3.
Prepare the hard drive.
Содержание DL100 - ProLiant G2 320GB File Print Appliance
Страница 46: ...Cabling 46 BBWC battery cabling to an optional controller Power supply 500 W cabling ...
Страница 47: ...Cabling 47 SATA cabling SATA cabling to the SGPIO connector and the 12C cable connector ...
Страница 48: ...Cabling 48 SAS cabling to the SGPIO connector and the 12C cable connector Internal USB cabling ...
Страница 49: ...Cabling 49 Fan cabling ...
Страница 107: ...Technical support 107 ...
Страница 108: ...Technical support 108 ...
Страница 112: ...Acronyms and abbreviations 112 UID unit identification USB universal serial bus ...