Chapter 1
Installing the Autoloader into a Rack 23
Ch
ap
ter
1
Caution
Ensure that the rack and all equipment mounted in the rack have
a reliable ground connection. Verify that the total current of the
rack components does not exceed the current rating of the power
distribution unit or outlet receptacles.
1.
If your rack does not have threaded screw holes
, install the clip nuts into
the rack by following the steps below:
a. Using the clip nut template as a guide, install four clip nuts into each
front column of the rack, ensuring that the clip nuts are in the same
location on both columns (see
Figure 4
).
b. Using the same side of the clip nut template as a guide, install two clip
nuts into each back column of the rack. The grey clip nuts on the
template indicate the position for the back clip nuts.
Note
Mount the top of the autoloader in the middle of the rack or 120
cm (48 inches) above the floor. Move the template so that the
holes on the template align with the holes on the rack.
Figure 4
Using the Clip Nut Template
Содержание C7745NB - SureStore DLT Tape Autoloader 1/9
Страница 9: ... ORVVDU ...
Страница 10: ... ...
Страница 34: ...34 Verifying the Host Configuration Chapter 1 ...
Страница 50: ... ULYH DQG 7DSH 2SHUDWLRQV KDSWHU ...
Страница 68: ... 5HWULHYLQJ XWRORDGHU QIRUPDWLRQ KDSWHU ...
Страница 96: ... 7URXEOHVKRRWLQJ RPPRQ 3UREOHPV KDSWHU ...
Страница 112: ... 0RYLQJ RU 6KLSSLQJ WKH XWRORDGHU KDSWHU ...
Страница 118: ... ULYH 0HGLD DQG DUFRGH 6SHFLILFDWLRQV SSHQGL ...
Страница 134: ... XWRORDGHU UURU RGHV SSHQGL ...
Страница 141: ... HFODUDWLRQ RI RQIRUPLW 6DIHW DQG 5HJXODWRU QIRUPDWLRQ HFODUDWLRQ RI RQIRUPLW ...
Страница 144: ... 5HJXODWRU QIRUPDWLRQ SSHQGL ...
Страница 153: ... ZHE DFFHVV ZHE EDVHG OLEUDU DGPLQLVWUDWRU ZHLJKW ZLGH 6 6 ...