![HP Aruba 6400 Series Скачать руководство пользователя страница 40](http://html.mh-extra.com/html/hp/aruba-6400-series/aruba-6400-series_installation-and-getting-started-manual_165838040.webp)
Unpacking the switch components
Prerequisites
Identify the components received with your Aruba 6400 Switch Series chassis.
NOTE: Some components may ship separately from the pallet on which you received your 6400
Series chassis.
Procedure
1. Open the top of the carton.
a. Remove the documentation folder.
b. Read the warning information included in the Unpacking Information booklet.
WARNING: The switch is heavy. To avoid possible injury, see the Unpacking Information
booklet before moving the switch.
2. Remove all of the accessories.
3. Lift the top carton off of the chassis.
4. Remove any remaining packing material covering the switch.
Chapter 5
Unpacking, lifting, and moving the chassis
40
Aruba 6400 Switch Series Installation and Getting Started
Guide
Содержание Aruba 6400 Series
Страница 77: ...Chapter 7 Installing components 77 ...