![HP Aruba 6400 Series Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/hp/aruba-6400-series/aruba-6400-series_installation-and-getting-started-manual_165838018.webp)
Cooling
Plan the installation site for adequate ventilation:
• Leave a minimum of 30 cm (11.81 in) of clearance at the front and rear of the switch. (Perforated rack
doors are acceptable within the 30cm spacing.)
NOTE: Air flow into and out of the switch is indicated by the arrows in the image below.
• Ensure that the rack for the switch is well ventilated, with minimal airflow obstruction at the front and
rear.
• The installation site HVAC system must be capable of removing all heat generated by the switch.
• Verify that the airflow design of the chassis is compatible with the airflow design of the installation site.
Figure 5: Aruba 6405 Switch cooling air flow
30 cm (1
1.01 in)
30 cm (1
1.01 in)
Figure 6: Aruba 6410 Switch cooling air flow
30 cm (1
1.01 in)
30 cm (1
1.01 in)
18
Aruba 6400 Switch Series Installation and Getting Started
Guide
Содержание Aruba 6400 Series
Страница 77: ...Chapter 7 Installing components 77 ...