Installing the SAN Switch 2/16
24
SAN Switch 2/16 Version 3.1.x Installation Guide
Unpack and Verify Carton Contents
Unpack and inspect the SAN Switch 2/16 carton contents as follows.
1. Inspect the shipping container for possible damage caused during transit.
2. Unpack the shipping cartons.
Note:
The Rack Mount Kit shown in
Figure 3
and
Table 3
may not represent the kit
that shipped with your switch. HP reserves the right to substitute Rack Mount Kits,
providing applicable instructions with each switch.
Содержание A7340A - Surestore FC 1Gb/2Gb Switch 16B
Страница 8: ...Contents 8 SAN Switch 2 16 Version 3 1 x Installation Guide ...
Страница 90: ...Backing Up the Configuration and Upgrading Firmware 90 SAN Switch 2 16 Version 3 1 x Installation Guide ...
Страница 96: ...Regulatory Compliance Notices 96 SAN Switch 2 16 Version 3 1 x Installation Guide ...
Страница 104: ...Technical Specifications 104 SAN Switch 2 16 Version 3 1 x Installation Guide ...