9
Figure 2 Airflow through the A10508-V chassis
2
4
1
3
(1) Inlet air vents for the power supplies
(2) Outlet air vents for the power supplies
(3) Inlet air vents for the chassis
(4) Outlet air vents for the chassis
Figure 3 Airflow through other A10500 switch chassis
1
2
3
3
4
4
(1) Inlet air vents for the power supplies
(2) Outlet air vents for the power supplies
(3) Inlet air vents for the chassis
(4) Outlet air vents for the chassis
Space
For easy maintenance, follow these guidelines:
x
Reserve at least 1 m (3.28 ft) of clearance between the rack and walls or other devices.