Appendix B
B-5
Configuring the HP-PB Card Cage
Planning the HP-PB Configuration
Table B-2
HP-PB Power Budgeting Worksheet (99x): EXAMPLE
1. I/O cards included in base configuration.
I/O Card
Qty
Power Requirements
per I/O Card (watts)
Total Power
Required (watts)
Slots/
Card
Total
Slots
Used
+12V
+5V
−
12V
+12V
+5V
−
12V
LAN/Console
1
(ThinLAN)
1
0.40
14.20
0.40
0.40
14.20
0.40
2
2
LAN/Console
(Ethertwist or
ThickLAN)
6.60
14.20
0.40
2
HP-FL (PB-FL)
1
3
0.48
19.65
0.60
1.44
58.95
1.80
2
6
SCSI
1
2
0.00
4.50
0.00
0.00
9.00
0.00
1
2
Fast/Wide SCSI
0.12
20.5
0.00
2
PBA-IB
1
(HP-IB)
1
1.13
27.50
0.66
1.13
27.50
0.66
2
2
802.3 LAN
1
6.00
10.65
0.00
6.00
10.65
0.00
1
1
802.5 Token Ring
0.00
8.30
0.00
1
PSI
.98
12.00
1.07
1
Sum of power used per voltage:
(Must not exceed total below)
8.97
(OK)
120.30
(OK)
2.86
(OK)
Total slots used
__13 (OK)
(Must not
exceed 14)
Maximum power available per voltage in HP-PB
I/O card cage
71.64
161.58
23.64
Total power used for +12V, +5V,
−
12V
(Must be less or equal to 222.82 watts)
132.3 (OK)
Содержание 3000 99x Family
Страница 8: ...Contents 6 Figures ...
Страница 10: ...Contents 8 Tables ...
Страница 12: ...Preface 2 ...
Страница 18: ...Preface 8 ...
Страница 20: ...Preface 10 ...
Страница 21: ...Chapter 1 1 1 Introduction 1 Introduction ...
Страница 30: ...1 10 Chapter1 Introduction Orientation Figure 1 2 SPU Cabinet Internal Layout Front ...
Страница 31: ...Chapter 1 1 11 Introduction Orientation Figure 1 3 SPU Cabinet Internal Layout Rear ...
Страница 32: ...1 12 Chapter1 Introduction Orientation ...
Страница 33: ...Chapter 2 2 1 Unpacking and Inspection 2 Unpacking and Inspection ...
Страница 43: ...Chapter 2 2 11 Unpacking and Inspection Moving the Cabinet to the Site Figure 2 5 Accessing the Lifting Nuts ...
Страница 48: ...2 16 Chapter2 Unpacking and Inspection Repackaging the Cabinet for Shipment ...
Страница 64: ...3 16 Chapter3 Installation PMB Cards Figure 3 6 Processor Main Bus PMB Card Cage Card Locations ...
Страница 68: ...3 20 Chapter3 Installation PMB Cards Figure 3 7 Inserting Removing a PMB Card ...
Страница 126: ...3 78 Chapter3 Installation Operating the Computer ...
Страница 142: ...A 16 AppendixA MPE iX Configuration and SYSGEN Default Configuration for 99x with HP FL Boot Device ALINK99x ...
Страница 143: ...Appendix B B 1 Configuring the HP PB Card Cage B Configuring the HP PB Card Cage ...
Страница 151: ...Appendix C C 1 Configuring the Remote Support Modem C Configuring the Remote Support Modem ...
Страница 168: ...C 18 AppendixC Configuring the Remote Support Modem Console LAN Card Modem Line Behavior ...
Страница 169: ...Appendix D D 1 Power Resiliency D Power Resiliency ...
Страница 171: ...Appendix D D 3 Power Resiliency Power System Figure D 1 PFC Module Locations ...
Страница 172: ...D 4 AppendixD Power Resiliency Power System Figure D 2 Power Modules and PMB Cards in the Front Card Cage T600 ...
Страница 173: ...Appendix D D 5 Power Resiliency Power System Figure D 3 Power Modules and PMB Cards in the Rear Card Cage T600 ...