6 Operation
6.1 Initial commissioning
Attention
Risk of damage to property as a result of performing initial commissioning
on your own authority. Initial commissioning must be performed by the
manufacturer’s customer service technicians .
Preparing for initial commissioning:
Checklist:
■
Have all the media connections been made (electric cabling and water piping)?
■
Is the heating medium available?
■
Are the hydraulics aligned and balanced?
■
Are all the control components installed and wired?
■
Are all of the respective trade groups (installer, electrician, etc.) present at the
scheduled time?
■
Are the system operating personnel present for training at the scheduled time?
6.2 Operation
The system runs automatically according to the programmed room temperature,
the week programme and the door contact switch.
■
Observe the operating instructions for the control system.
■
Ensure free air outlet.