background image

7  Maintenance and repair

 Caution

Risk of injury from incorrect work. Maintenance work must be carried out by 

trained personnel.

7.1  Safety

Before performing any work on the unit:

 

Turn the on-site main switch to the ‘Off’ position and secure it against being 

switched back on.

 

Wait at least 5 minutes after switching the unit off.

 Caution

The use of condensers can pose a danger of fatal injury from directly 

touching live parts even after the unit is switched off. Only open the unit 

after waiting 5 minutes.

 

Observe the accident prevention regulations.

 

Observe the particular dangers involved when working on electrical systems.

 

When working in the unit, take precautions against unprotected, sharp metal 

edges.

 

Immediately replace damaged or removed informational and warning signs.

 

Following maintenance work, professionally reassemble all dismantled protec-

tive devices.

7.2  Maintenance

Maintenance schedule

Activity

Interval

Cleaning the heat exchanger

If required,  

at least once per year before the heating season

Check function

1 x annually

Cleaning the heat exchanger

 

Carefully clean the heat exchanger with compressed air.

 

– Dismantle the air inlet grille for cleaning.

 

Ensure that you do not damage the fins.

7.3  Repair

If repairs are necessary, contact the manufacturer’s customer service department.

17

TopVent

®

 TW

Design, installation and operation

Maintenance and repair

4 216 285-en-02

Содержание TopVent TW Series

Страница 1: ...TopVent TW Design installation and operation TopVent TW Air curtain...

Страница 2: ...ound data 8 4 5 Dimensions and weights 8 4 6 Specification text 8 5 Transport and installation 9 5 1 Delivery 9 5 2 Requirements for the installation site 9 5 3 Installation 10 5 4 Hydraulic installat...

Страница 3: ...ove this use is considered to be not as intended The manufacturer can accept no liability for damage resulting from improper use 1 2 User group The units are only allowed to be installed operated and...

Страница 4: ...read the operating instructions before unpacking installing commis sioning and before maintaining the equipment Store the operating instructions so that they are easily accessible Observe any attached...

Страница 5: ...le fan and a custom made heating coil 3 1 Unit construction The TopVent TW consists of the following components Heat exchanger consisting of copper tubes and aluminium fins Tangential fan with energy...

Страница 6: ...using a door contact switch The connected units are switched on via door contact if the door is open digital input Adjusting the fan speed The required speed can be infinitely adjusted Pump or valve c...

Страница 7: ...30 1 90 Supply voltage VAC 230 230 230 Frequency Hz 50 50 50 Max mounting height m 3 7 3 7 3 7 Max horizontal reach m 3 7 3 7 3 7 Table 4 Technical data 4 3 Heat output Temperature of the heating med...

Страница 8: ...Weight kg 22 6 31 2 38 8 Table 7 Dimensions and weights 4 6 Specification text TopVent TW Air curtain Sturdy casing made of galvanised sheet steel including suspension set for hori zontal or vertical...

Страница 9: ...ts wrong deliveries and possible transport damage immediately in writing 5 2 Requirements for the installation site Position the units over or next to the door The air flow must cover the entire door...

Страница 10: ...onal material is required for the other installation variants Variant 2 horizontal unit retaining brackets facing upwards M8x55 screws x4 for TW 2 x6 for TW 3 TW 5 Variant 3 vertical unit M8x70 screws...

Страница 11: ...the retaining brackets Fasten the retaining brackets with the M8 screws 3 onto the unit Install the unit on the wall Use the packaging box as a drilling template 1 Position of the holes 2 Retaining br...

Страница 12: ...ning brackets with the M8 screws 2 onto the unit Install the unit on the wall Use the packaging box as a drilling template 1 Retainer cover 2 M8x70 screw with washer not included in the scope of deliv...

Страница 13: ...by means of the flow or return lines 1 Air vent with shut off 2 Control valve 3 Balancing valve 4 Drain valves 5 Shut off valves 6 Flow 7 Return Fig 11 Connecting the heating coil Ventilation If the...

Страница 14: ...c EC Reinstall the side cover Designation Voltage Cable Comments Power supply for TopVent 1 230 VAC NYM 3 1 5 mm min Power supply EasyTronic EC 1 230 VAC NYM 2 1 5 mm min External room temperature sen...

Страница 15: ...1 2 1 2 1 2 L1 N PE L1 N 3 9 10 Ai G L1 N PE 2 1 N PE L1 N PE L1 2x1 5 mm COM Door contact Pump or valve 110 230 VAC by the installer EasyTronic EC TopVent TW further TopVent TW max 10 Terminals by th...

Страница 16: ...medium available Are the hydraulics aligned and balanced Are all the control components installed and wired Are all of the respective trade groups installer electrician etc present at the scheduled t...

Страница 17: ...en working on electrical systems When working in the unit take precautions against unprotected sharp metal edges Immediately replace damaged or removed informational and warning signs Following mainte...

Страница 18: ...fatal injury from directly touching live parts even after the unit is switched off Only open the unit after waiting 5 minutes Drain the heating medium circuit Dismantle all media connections Disconnec...

Страница 19: ...19 TopVent TW Design installation and operation Dismantling 4216285 en 02...

Страница 20: ...90 Vaduz Liechtenstein Tel 423 399 24 00 info klimatechnik hoval com www hoval com United Kingdom Hoval Ltd Northgate Newark Notts NG24 1JN Tel 01636 672711 hoval hoval co uk www hoval co uk 20 421628...

Отзывы: