
�
Operation and Setup
Working Parameters Display
Battery Type-string Number
Current & Completion
Percentage
Task Status
Present
Current
---
Capacity
Charged
Input
Voltage
--
Operating
Temperature
(i)
5.26 mWh
External Discharging
External Discharging status Simple Operation
.---
Operation Time
Present
---
Power
Current Total
Battery
Voltage
-
-
--
Charged
Times
Input
Power
1. Connect the battery, which is going to discharge ,to the input ends( DC port) of the
charger, and wait for the system to complete its self-checking, then in the standby
interface, connect the high power resistance load to the charger's output ends;
2. In the standby state, short press Okey to pop up the "Task Settings" menu, set the task
to "Ext. discharge" , adjust the task parameters, and short press O key to start the task;
3. When the Ext. discharge task is executing, short press the O key to pop up the "Adjust
Task" menu, will adjust the Ext. discharge current, long press the Okey can stop the
current task;
4. Enjoy.
-
HGT1.
I
H6 PRO AC/DC Smart Charger