�
Operation and Setup
Working Parameters Display
Battery Type-string Number
Current & Completion
Percentage
Present
Current
Capacity
__
_
__
Charged
0
4.003V
8
4.006V
8
4.008V
0
4.007V
Charging
Charging Status Simple Operation
8
4.00SV
8
4.001V
Operation Time
Current Total
Battery
Voltage
Cell Voltage
1. Connect power supply to the AC or DC port of the charger, wait for the system
to complete the self-checking. connect the battery to the charger in the standby interface;
2. In the standby state, short press Okey to pop up the "Task Settings" menu, set the
task to "Charge" , adjust the task parameters, and short press O key to start the task;
Press/\ key or
v
key during operation can switch the display information in the lower half of the
screen, which are cell voltage, cell internal resistance and run data, the cell voltage and internal
resistance can only be displayed in the mode of balance charging (2 minutes) .
3. When the charge task is executing, short press the O key to pop up the "Adjust Task"
menu, will adjust the charge current, long press the O key can stop the current task;
4. Enjoy.
-
HGT;
I
H6 PRO AC/DC Smart Charger