12
Connector K1
Pins #1 through #10
#1, 9
Magnetic Contactor
#2
Hot Gas Valve
#3
Line Valve
#4
Pump Motor (icemaking)
#5
Pump Motor (drain)
#6
Water Valve
#7, 10 Power (line, Bin Control)
#8
Open
Dip Switch
Defrost Timer, Drain Timer
& Drain Counter
Connector K5
Float Switch
Connector K4
Open
(not connected)
Connector K3
Defrost Control
(Thermistor)
(Alpine “C”/Alpine Board)
Содержание KM-150BAF
Страница 5: ...5 I SPECIFICATIONS 1 KM 150BAF ...
Страница 6: ...6 2 KM 150BWF ...
Страница 7: ...7 II GENERAL INFORMATION 1 CONSTRUCTION a KM 150BAF ...
Страница 8: ...8 b KM 150BWF ...
Страница 14: ...14 Control Products HOSHIZAKI001 Board ...
Страница 15: ...15 Control Products HOS 001A Board ...
Страница 23: ...23 TEST PROGRAM OF ALPINE CONTROLLER BOARD ...
Страница 25: ...25 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERANT CIRCUIT a KM 150BAF ...
Страница 26: ...26 b KM 150BWF ...
Страница 30: ...30 4 PERFORMANCE DATA a KM 150BAF Air cooled ...
Страница 31: ...31 b KM 150BWF Water cooled ...