16
[c] SEQUENCE
1st Cycle
1. Unit energized and Control Switch to “ICE”
position. Water supply cycle starts.
IMPORTANT
Water Valve
opening is limited
to 6 minutes.
5. After the first 5 minutes in freeze cycle.
Ready to complete freeze cycle when Float
Switch circuit opens.
4. Defrost Timer stops counting.
Defrost cycle is completed and freeze cycle
starts.
IMPORTANT
Board never accepts freeze completion signal
within the first 5 minutes in freeze cycle.
IMPORTANT
1. Board never accepts defrost completion
signal within the first 2 minutes in defrost
cycle.
2. Defrost cycle time is limited to 20 minutes
even if Defrost Timer does not stop counting.
3. Thermistor reads 48° F (9°C).
Defrost Timer, adjustable from
1 to 3 minutes, starts counting.
2. After 1 minute,
Defrost cycle starts.
Содержание KM-150BAF
Страница 5: ...5 I SPECIFICATIONS 1 KM 150BAF ...
Страница 6: ...6 2 KM 150BWF ...
Страница 7: ...7 II GENERAL INFORMATION 1 CONSTRUCTION a KM 150BAF ...
Страница 8: ...8 b KM 150BWF ...
Страница 14: ...14 Control Products HOSHIZAKI001 Board ...
Страница 15: ...15 Control Products HOS 001A Board ...
Страница 23: ...23 TEST PROGRAM OF ALPINE CONTROLLER BOARD ...
Страница 25: ...25 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERANT CIRCUIT a KM 150BAF ...
Страница 26: ...26 b KM 150BWF ...
Страница 30: ...30 4 PERFORMANCE DATA a KM 150BAF Air cooled ...
Страница 31: ...31 b KM 150BWF Water cooled ...