41
GEAR MOTOR
24) Cut the Gear Motor leads at the wire connector.
25) Remove the three Hexagon Bolts securing the Gear Motor on the chassis.
26) Remove the Gear Motor.
27) Install the new Gear Motor.
28) Assemble the removed parts in the reverse order of which they were removed
WARNING
Be careful not to scratch the surface of the O-ring, or it may cause water
leaks. Handle the Mechanical Seal with care not to scratch nor to
contaminate its contact surface.
29) Check for water leaks.
WARNING
After assembling the Extruding Head, be sure to check that the Auger does
not come into contact with the inner surface of the Evaporator and that there
is not any abnormal noise from the Bearing.
30) Turn on the power supply.
31) Move the Ice Making Switch to the “ON” position.
A2AAA0269806
Содержание DCM-240BAF
Страница 8: ...8 A2AAA0269804 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERANT CIRCUIT...
Страница 9: ...9 A2AAA0269804 2 WIRING DIAGRAM...
Страница 11: ...11 A2AAA0269806 RESERVOIR FILLS UP GEAR MOTOR TURNS ON...
Страница 12: ...12 A2AAA0269806 COMPRESSOR STARTS 60 SEC AFTER GEAR MOTOR...
Страница 13: ...13 A2AAA0269806 ICE MAKING CONTINUES...
Страница 14: ...14 A2AAA0269806 BIN CONTROL SWITCH TRIPPED COMPRESSOR STOPS 90 SEC LATER...
Страница 15: ...15 A2AAA0269806 GEAR MOTOR STOPS 60 SEC AFTER COMPRESSOR...
Страница 16: ...16 A2AAA0269806 DISPENSE ICE BIN CONTROL STILL TRIPPED...
Страница 17: ...17 A2AAA0269806 DISPENSE WATER BIN CONTROL STILL TRIPPED...
Страница 19: ...19 A2AAA0269806 FLUSH SWITCH ACTIVATED...
Страница 20: ...20 A2AAA0269806 FLUSH VALVE ACTIVATED WITH TIMER...
Страница 21: ...21 A2AAA0269806 AGITATION TIMER ACTIVATES GEAR MOTOR...
Страница 45: ...45 Fig 6 Fig 5 Middle Front Panel Thumbscrew Spout A Spout B A2AAA0269806...