
WI-0055: SQ2 User Manual
Version 1.0
11
Horizon Signal
SQ2 User Manual
Main Menu
The Main Menu can be accessed at any time by pressing the “M” button on the PTS Programmer. By using the Up and
Down buttons, the user can scroll through the following menu options:
Programming
Create new signal programs
Edit Program
Revise a program saved in the PTS Programmer’s memory
Download Program
Download and save the currently running program into the PTS Programmer’s
memory from the controller
Upload Program
Upload a saved program from PTS programmer to controller and start it
Delete Program
Erase a program from the PTS Programmer’s memory
Set The Clock
Change the system’s date and time *Important for Day phasing *
Options
Access the Options Menu *Enable or Disable Red Clearance Extender function*
(see page 19 for more info)
Configure Radio
Set radio network parameters
Basic Programming
Programs can be edited or changed at any time while the PTS system is running. By plugging in the PTS Programmer,
the user can create new programs without any effect on the current program. A new program that is created will be
loaded during the next Red Clearance time, and will be undetectable by motorists.
The PTS Programmer has several program templates for you to choose from. These simple templates represent the
most common types of work zones. To pick the correct template, you will need to know how many phases of traffic will
be in your work zone and how many Horizon controllers will be in the system. When necessary, basic programs will
automatically group Lights numerically based on their controller identities.
For more advanced programming, or programs that do not fall into any of the templates, “SPECIAL” programming
should be used.
Programming
3 Phases 3 Controllers
3 Phases 6 Controllers
4 Phases 4 Controllers
2 Phases 2 Controllers
2 Phases 4 Controllers
1.
Select the appropriate programming type and press the “E” button. For SQ2
systems, select “2-Phases 4 Controllers.” Meaning 2 phases of traffic with 2 SQ2s
per approach (4 controllers).
Setting The Clock
Set the clock
01/12/2020
15:45:55
Set
It is important to set the PTS Programmer’s clock to the correct date and time. This
ensures that the Data Log is keeping an accurate record of events, and also is vital
when using day phase programming, which changes programs based on time of day,
or day of week.
Use the “Arrow” buttons to navigate and select the values to change. Use “Plus and
Minus” buttons to adjust those values. Press “E” on “Set” when complete.
Содержание SQ2
Страница 1: ...WI 0055 SQ2 User Manual Version 1 0 1 Horizon Signal SQ2 User Manual User Manual...
Страница 5: ...WI 0055 SQ2 User Manual Version 1 0 5 Horizon Signal SQ2 User Manual...
Страница 7: ...WI 0055 SQ2 User Manual Version 1 0 7 Horizon Signal SQ2 User Manual...
Страница 20: ...WI 0055 SQ2 User Manual Version 1 0 20 Horizon Signal SQ2 User Manual...
Страница 21: ...WI 0055 SQ2 User Manual Version 1 0 21 Horizon Signal SQ2 User Manual...
Страница 22: ...WI 0055 SQ2 User Manual Version 1 0 22 Horizon Signal SQ2 User Manual SQ2 Deployed Dimensions...
Страница 25: ...WI 0055 SQ2 User Manual Version 1 0 25 Horizon Signal SQ2 User Manual...
Страница 27: ...WI 0055 SQ2 User Manual Version 1 0 27 Horizon Signal SQ2 User Manual...