BEFORE
YOU
BEGIN
8
INTRODUCTION
IMPORT
ANT
PRECAUTIONS
ASSEMBL
Y
BEFORE
YOU
BEGIN
ELLIPTICAL
OPERA
TION
LIMITED
W
ARRANTY
TROUBLESHOOTING
&
MAINTENANCE
CONDITIONING
GUIDELINES
ASSEMBLY
STEP 2
MAIN FRAME
REAR STABILIZER
BOLT (A)
SPRING WASHER (B)
FLAT WASHER (C)
SCREW (B)
A) Open
HARDWARE BAG FOR STEP 2.
B) Secure
REAR STABILIZER
to
MAIN FRAME
using 2
SCREWS (B).
NOTE: Make sure holes are aligned before inserting SCREWS.
SCREWS (B)
30 mm
Qty: 4
HARDWARE BAG FOR STEP 2 CONTENTS :