Electrode Preparation
Calibration
Measurement
After Measurement
E
lectrode Preparation
This chapter describes the preparation that must be performed before
using the product.
Assembling the electrode (only when
use for first time)............................ 10
Filling with internal solution ......... 12
Rinsing the electrode..................... 15
Connecting the electrode to the
meter ............................................... 17
Содержание 6561S-10C
Страница 1: ...Instruction Manual Combination type Fluoride Ion Selective Electrode 6561S 10C ELECTRODE...
Страница 8: ......
Страница 20: ...8...
Страница 30: ...18...
Страница 54: ...42...
Страница 60: ...48...
Страница 70: ...58...
Страница 87: ...75 Material External dimensions Unit mm 16 5 O D 18 85 150...