LCN System Installation
3-12
9/96
3.6
3.6 LCN CABLING
As shown in Figure 2-2, LCN cabinets have the intracabinet cables installed in the factory.
The system is then tested in a system configuration and the cables inside the cabinet are left
in place to be shipped with the equipment. The remaining installation task is for the
cabinets and the consoles to be cabled together as shown in Figure 3-9, Figure 3-10, and
Figure 3-11.
Rear View
Coax Connection
to LCN System
Cable A
Cable B
Cable A
Cable B
53851
Rear View
Figure 3-9 — Intracabinet Coax Cabling between LCN Cabinets
After the Universal Stations have been complexed (bolted) together, coax cable can be
connected as shown in Figure 3-10 or Figure 3-11. Cables can exit and enter each US
through the bottom or through the side openings.
Содержание TotalPlant LCN
Страница 1: ...LCN System Installation SW20 500 ...
Страница 2: ......
Страница 3: ...LCN Installation LCN System Installation SW20 500 Release 510 CE Compliant 9 96 ...
Страница 10: ...LCN System Installation iv 9 96 ...
Страница 16: ...LCN System Installation 2 4 9 96 ...
Страница 42: ...LCN System Installation 4 6 9 96 ...
Страница 50: ...LCN System Installation 6 2 9 96 ...
Страница 58: ...LCN System Installation 8 6 9 96 ...
Страница 60: ...LCN System Installation 9 2 9 96 ...
Страница 62: ...LCN System Installation 10 2 9 96 10 1 52459 Terminators Figure 10 1 Taps Mounted in an LCN Cabinet ...
Страница 66: ...LCN System Installation 10 6 9 96 10 4 15170 Figure 10 4 Taps Mounted in a Universal Station Ergonomic ...
Страница 68: ...LCN System Installation 11 2 9 96 ...
Страница 70: ...LCN System Installation 12 2 9 96 ...
Страница 83: ...LCN System Installation 15 5 9 96 15 7 15052 Figure 15 6 Mounting of an Two LCN MAUs ...
Страница 84: ...LCN System Installation 15 6 9 96 ...
Страница 112: ...LCN System Installation B 6 9 96 ...
Страница 128: ...LCN System Installation Index 4 9 96 ...
Страница 130: ......
Страница 131: ......