LCN System Installation
2-1
9/96
2
SYSTEM INSTALLATION
Section 2
Please read this section before unpacking or moving the equipment.
2.1 INSTALLATION OVERVIEW
This section provides instructions for receiving, unpacking, and placement of the
TotalPlant Solution (TPS) System LCN equipment cabinets, Operator Interface Stations
(OIS) and Universal Stations (USs), see Figure 2-1. The instructions assume that all of the
system LCN modules and all interconnecting LCN cables within the cabinets and consoles
have been installed and connected at the factory as shown in Figure 2-2.
1253
Figure 2-1 —TPS Universal Station and Equipment Cabinet
Содержание TotalPlant LCN
Страница 1: ...LCN System Installation SW20 500 ...
Страница 2: ......
Страница 3: ...LCN Installation LCN System Installation SW20 500 Release 510 CE Compliant 9 96 ...
Страница 10: ...LCN System Installation iv 9 96 ...
Страница 16: ...LCN System Installation 2 4 9 96 ...
Страница 42: ...LCN System Installation 4 6 9 96 ...
Страница 50: ...LCN System Installation 6 2 9 96 ...
Страница 58: ...LCN System Installation 8 6 9 96 ...
Страница 60: ...LCN System Installation 9 2 9 96 ...
Страница 62: ...LCN System Installation 10 2 9 96 10 1 52459 Terminators Figure 10 1 Taps Mounted in an LCN Cabinet ...
Страница 66: ...LCN System Installation 10 6 9 96 10 4 15170 Figure 10 4 Taps Mounted in a Universal Station Ergonomic ...
Страница 68: ...LCN System Installation 11 2 9 96 ...
Страница 70: ...LCN System Installation 12 2 9 96 ...
Страница 83: ...LCN System Installation 15 5 9 96 15 7 15052 Figure 15 6 Mounting of an Two LCN MAUs ...
Страница 84: ...LCN System Installation 15 6 9 96 ...
Страница 112: ...LCN System Installation B 6 9 96 ...
Страница 128: ...LCN System Installation Index 4 9 96 ...
Страница 130: ......
Страница 131: ......