![Honeywell TotalPlant LCN Скачать руководство пользователя страница 89](http://html.mh-extra.com/html/honeywell/totalplant-lcn/totalplant-lcn_system-installation_152070089.webp)
LCN System Installation
A-1
9/96
A
OPTIONS INSTALLATION FOR
UNIVERSAL STATIONS
Appendix A
This section provides brief installation procedures for adding an option or feature to an existing
TotalPlant
Solution (TPS
)
System. These procedures, together with the TPS System
Configuration Guide, and the information contained in the various equipment installation and
service manuals, provide the necessary information to modify or expand your system.
NOTE
This section applied to TPS equipment installed before 1/01/96. The newer CE Compliant
equipment installation is covered in Appendix C.
A.1 UNIVERSAL STATION COMPLEXING (PHYSICAL)
A complete complexing kit, P-ZCKY1, is available from Honeywell for on-site expansion.
The kit includes hardware for complexing the keyboard and work-surface support trays,
for complexing the console bases, and the trim kit for the ends of each console complex.
See Section 3 for installation instructions. When viewed from the LCN, each station is
seen as a separate unit.
A.2 MODULE INSTALLATION
The LCN electronics modules are shipped complete with power cord, front cover,
attachment hardware, and LCN intercabinet cables, including tees and terminators. Refer
to installation drawings for connection details. See Section 8 for system pinning (node
addressing).
A.3 PERIPHERAL INSTALLATION AND CABLING
The standard built-in peripherals, cartridge disk drives, floppy disk drives, and trend pen
recorders, are installed and cabled into the Universal StationX at the factory. Removal and
replacement procedures are provided in the applicable service manual and installation
drawings. The matrix printer is packaged separately for shipping.
After unpacking, position the printer on the table top. Route the power cord and data
cables down the back of the console and up through the cable cutouts. Connect the power
cord into any unused receptacle on the power entry box. The data cable connections, as
applicable to the Universal StationX, are shown in Figures A-1 and A-2. See subsection
A.7 for cabling information for the Universal Work Station.
Содержание TotalPlant LCN
Страница 1: ...LCN System Installation SW20 500 ...
Страница 2: ......
Страница 3: ...LCN Installation LCN System Installation SW20 500 Release 510 CE Compliant 9 96 ...
Страница 10: ...LCN System Installation iv 9 96 ...
Страница 16: ...LCN System Installation 2 4 9 96 ...
Страница 42: ...LCN System Installation 4 6 9 96 ...
Страница 50: ...LCN System Installation 6 2 9 96 ...
Страница 58: ...LCN System Installation 8 6 9 96 ...
Страница 60: ...LCN System Installation 9 2 9 96 ...
Страница 62: ...LCN System Installation 10 2 9 96 10 1 52459 Terminators Figure 10 1 Taps Mounted in an LCN Cabinet ...
Страница 66: ...LCN System Installation 10 6 9 96 10 4 15170 Figure 10 4 Taps Mounted in a Universal Station Ergonomic ...
Страница 68: ...LCN System Installation 11 2 9 96 ...
Страница 70: ...LCN System Installation 12 2 9 96 ...
Страница 83: ...LCN System Installation 15 5 9 96 15 7 15052 Figure 15 6 Mounting of an Two LCN MAUs ...
Страница 84: ...LCN System Installation 15 6 9 96 ...
Страница 112: ...LCN System Installation B 6 9 96 ...
Страница 128: ...LCN System Installation Index 4 9 96 ...
Страница 130: ......
Страница 131: ......