SPYDER MODEL 5 ENGINEERING TOOL
–
USER GUIDE
53
31-00282ES-01
Periodic Program
Creates the control strategy running in a cyclic manner on a fixed time base. All function blocks in the root folder and its
subfolders are processed. The periodic program is executed every 500 ms within the controller.
Procedure
1.
Double-click
Periodic Program
in the tree, and then select the
Wire Sheet
view.
2.
Open the “
honI
rmControl”
palette.
3.
From the palette, add control items to the wire sheet via drag & drop.
4.
Create/change the control logic by applying desired steps such as connecting, adding, deleting, moving icons,
and/or adding and deleting connections.
Synchronization Check
Any modifications on the
Periodic Program wire sheet are detected by the control manager. Modifications can be any of
the following:
•
Added item
•
Deleted item
•
Moved item
•
Deleted connection
•
Added connection
•
etc.
As result, all modified items will be not in sync with the application in the controller and hence indicated by a yellow
warning” symbol
on the item.
The application can be synchronized according to the set teaching mode, on demand or immediate.
After synchronization, the warning symbols are removed and the items are indicated in its synchronized state.
See also the
description of the “