GENERATOR/CHARGING SYSTEM
8-27
INVERTER UNIT INSPECTION
Remove the inverter unit (page 8-7).
Check for continuity between the terminals using a
tester with diode measuring function according to the
tables below.
• Set the tester to the
mark position and
perform this inspection.
• The “no continuity” display varies on each tester.
When there is no continuity, the display shows the
same as it does when the tester is not used for
measurement (OL, OF, etc).
• Some testers have reverse polarity.
Unit: V
Unit: V
Unit: V
(-) Tester probe
Connec-
tor
(+)Tester pr
obe
Con-
nector
Terminal
5
1
0.3 - 0.8
3
0.3 - 0.8
(+) Tester probe
Connec-
tor
(-)Tester probe
Con-
nector
Terminal
1
1
0.3 - 0.8
3
0.3 - 0.8
(-) Tester probe
Connec-
tor
(+)Tester
probe
Con-
nector
Terminal
2
3
4
1
0.3 - 0.8
0.3 - 0.8
0.3 - 0.8
Viewed from terminal side
Viewed from terminal side
5
13
10
13
10
10
Содержание EU3000i Handi
Страница 37: ...MEMO ...
Страница 73: ...MEMO ...
Страница 75: ...FUEL SYSTEM 6 2 FUEL SYSTEM TOOLS Float level gauge 07401 0010000 ...
Страница 97: ...MEMO ...
Страница 105: ...GENERATOR CHARGING SYSTEM 8 2 GENERATOR CHARGING SYSTEM TOOLS Flywheel puller set 07935 8050004 ...
Страница 133: ...MEMO ...
Страница 149: ...MEMO ...
Страница 150: ...12 1 12 12 MUFFLER MUFFLER REMOVAL INSTALLATION 12 2 ...
Страница 179: ...MEMO ...
Страница 180: ...16 1 16 16 TECHNICAL FEATURES FRAME MADE OF MAGNESIUM 16 2 INDICATOR 16 3 ...
Страница 185: ...MEMO ...
Страница 186: ...17 1 17 17 WIRING DIAGRAMS HOW TO READ A WIRING DIAGRAM RELATED INFORMATION 17 2 WIRING DIAGRAMS 17 4 ...
Страница 193: ...MEMO ...