GENERATOR/CHARGING SYSTEM
8-9
C TYPE ONLY
Remove the following parts:
– Side cover (page 5-7)
– Inverter unit (page 8-7)
CONTROL PANEL
REMOVAL/INSTALLATION:
Remove the engine stop switch as shown.
ENGINE STOP SWITCH 2P CONNECTOR
REMOVAL/INSTALLATION:
Move the terminal as shown.
TAPPING SCREW (5 x 16 mm) (2)
CONTROL WIRE HARNESS TERMINAL
ENGINE STOP SWITCH
2P CONNECTOR
RECTIFIER
GENERATOR WIRE HARNESS TERMINAL
GENERATOR WIRE
HARNESS TERMINAL
CONTROL WIRE
HARNESS TERMINAL
1.4 N·m (0.14 kgf·m, 1 lbf·ft)
BOLT (6 x 14 mm)
BOLT (6 x 14 mm)
BOLT (6 x 57 mm) (2)
BOLT (6 x 10 mm) (2)
9.3 N·m (0.95 kgf·m,
6.9 lbf·ft)
12
GND1
3
Содержание EU3000i Handi
Страница 37: ...MEMO ...
Страница 73: ...MEMO ...
Страница 75: ...FUEL SYSTEM 6 2 FUEL SYSTEM TOOLS Float level gauge 07401 0010000 ...
Страница 97: ...MEMO ...
Страница 105: ...GENERATOR CHARGING SYSTEM 8 2 GENERATOR CHARGING SYSTEM TOOLS Flywheel puller set 07935 8050004 ...
Страница 133: ...MEMO ...
Страница 149: ...MEMO ...
Страница 150: ...12 1 12 12 MUFFLER MUFFLER REMOVAL INSTALLATION 12 2 ...
Страница 179: ...MEMO ...
Страница 180: ...16 1 16 16 TECHNICAL FEATURES FRAME MADE OF MAGNESIUM 16 2 INDICATOR 16 3 ...
Страница 185: ...MEMO ...
Страница 186: ...17 1 17 17 WIRING DIAGRAMS HOW TO READ A WIRING DIAGRAM RELATED INFORMATION 17 2 WIRING DIAGRAMS 17 4 ...
Страница 193: ...MEMO ...