Homa SKB 6 Скачать руководство пользователя страница 18

18 | EngliSH

Beware of damp!

Moisture penetrating cables can damage them 

and render them useless. Furthermore, water can 

penetrate into the terminal compartment or motor 

and cause damage to the terminals or the winding.  

Never immerse cable ends in the pumped fluid or 

other liquids.

2.5.1. Electrical connection

When the machine is connected to the electrical control 
panel, especially when electronic devices such as soft 
startup control or frequency drives are used, the relay 
manufacturer‘s specifications must be followed in order 
to conform to EMC. Special separate shielding measures 
e.g. special cables may be necessary for the power supply 
and control cables.

The connections may only be made if the relays meet the 
harmonized EU standards. Mobile radio equipment may 
cause malfunctions.

2.5.2. Ground connection

Our products (machine including protective devices and 
operating position, auxiliary hoisting gear) must always be 
grounded. If there is a possibility that people can come 
into contact with the machine and the pumped liquid (e.g. 
at construction sites), the grounded connection must be 
additionally equipped with a fault current protection de-
vice. 

2.6. Operating procedure

When operating the product, always follow the locally 
applicable laws and regulations for work safety, accident 
prevention and handling electrical machinery. To help to 
ensure safe working practice, the responsibilities of em-
ployees should be clearly set out by the owner. All per-
sonnel are responsible for ensuring that regulations are 
observed. Certain parts such as the rotor and propeller 
rotate during operation in order to pump the fluid. Certain 
materials can cause very sharp edges on these parts.

Beware of rotating parts!

The moving parts can crush and sever limbs. Never 

reach into the pump unit or the moving parts during 

operation. Switch off the machine and let the moving 

parts come to a rest before maintenance or repair 

work!

2.7. Safety and control devices

Our products are equipped with various safety and con-
trol devices. These devices must never be dismantled or 
disabled. Equipment must be checked by an electrician 
for proper functioning before start-up (see the “Electrical 
Connection” data sheet). Please remember that certain 
equipment requires a decoder device or relay to function 
properly. 

This decoder can be obtained from the manufacturer or a 
specialist electronics dealer.
Personnel must be informed of the installations used and 
how they work.

Caution!

Never operate the machine if the safety and monitoring devices 

have been removed or damage, or if they do not work.

2.8. Pumped fluids 

Each pumped fluid differs in regard to composition, cor-
rosiveness, abrasiveness, TS content and many other 
aspects. Generally, our products can be used for many 
applications. For more precise details, see chapter 3, the 
machine data sheet and the order confirmation. It should 
be remembered that if the density, viscosity or the gener-
al composition change, this can also alter many parame-
ters of the product.

Different materials and impeller shapes are required for 
different pumped fluids. The more exact your specifica-
tions on your order, the more exactly we can modify our 
product to meet your requirements. If the area of applica-
tion and/or the pumped fluid change, we will be happy to 
offer supportive advice.

When switching the product into another pumped fluid, 
observe the following points:

• 

Products which have been operated in sewage or 
waste water must be thoroughly cleaned with pure 
water or drinking water before use.

• 

Products which have pumped fluids which are haz-
ardous to health must always be decontaminated 
before changing to a new fluid. Also clarify whether 
the product may be used in a different pumped fluid.

• 

With products which have been operated with a lu-
bricant or cooling fluid (such as oil), this can escape 
into the pumped fluid if the mechanical shaft seal is 
defective.

Danger - explosive fluids!

It is absolutely prohibited to pump explosive liquids 

(e.g. gasoline, kerosene, etc.). The products are not 

designed for these liquids!

2.9. Sound Pressure

Depending on the size and power (kW), the pump has 
a sound pressure of about 40dB (A) to 70dB (A) during 
operation. However, the actual sound pressure depends 
on several factors. These are, for example, the type of 
installation and set-up, mounting of accessories, piping, 
operating point, immersion depth, and much more.

Содержание SKB 6

Страница 1: ...Original Betriebsanleitung EN Original Instruction Manual SKB 6 SKB 9...

Страница 2: ...des Betriebs 06 2 7 Sicherheits und berwachungseinrichtungen 06 2 8 F rdermedien 06 2 9 Schalldruck 06 3 Allgemeine Beschreibung 07 3 1 Verwendung 07 3 2 Einsatzarten 07 3 3 Aufbau 07 4 Verpackung Tr...

Страница 3: ...eitet und frei von M ngeln ist Alle Produkte besitzen einen h chstm glichen Qualit ts standard und unterliegen vor Auslieferung einer techni schen Endkontrolle Durch eine von HOMA Pumpenfabrik GmbH er...

Страница 4: ...en de 1 6 Fachbegriffe In dieser Betriebsanleitung werden verschiedene Fachbe griffe verwendet Trockenlauf Ein Trockenlauf ist auf jeden Fall zu vermeiden hier l uft die Pumpe mit voller Drehzahl es i...

Страница 5: ...tillstand gekommen sein Der Bediener hat jede auftretende St rung oder Unregelm igkeit sofort seinem Verantwortlichen zu melden Eine sofortige Stillsetzung durch den Bediener ist zwingend erforderlich...

Страница 6: ...seinrichtungen ausgestattet Diese Einrich tungen d rfen nicht demontiert oder abgeschaltet wer den Einrichtungen m ssen vor der Inbetriebnahme vom Elek trofachmann angeschlossen und auf eine korrekte...

Страница 7: ...TCM GRP Verwendbare Steuerger te PS15 PS25 4 Verpackung Transport und Lagerung 4 1 Anlieferung Nach Eingang ist die Sendung sofort auf Sch den und Vollst ndigkeit zu berpr fen Bei eventuellen M ngeln...

Страница 8: ...t werden kann Die Hebevorrichtung muss eine maximale Tragkraft aufweisen die ber dem Gewicht des Schachtes mit Anbauteilen und Kabel liegt Das Fundament Bauwerk muss eine ausreichende Festigkeit f r e...

Страница 9: ...ebssicherheit Die SKB 6 bzw SKB 9 Sch chte sind f r normale Ein satzf lle bis zu einem Grundwasserstand von 0 5m unter Schachtoberkante auftriebssicher ausgef hrt Bei einem h heren Grundwasserstand ka...

Страница 10: ...Stecker sind vor Gebrauch auf Besch digung zu pr fen Das Ende des Anschlusskabels darf nicht ins Wasser eingetaucht werden da sonst Wasser in den Mo tor Anschlussraum gelangen kann Motorschutzschalte...

Страница 11: ...tehen m s sen dekontaminiert werden Ebenso ist darauf zu achten dass sich keine gesundheitsgef hrdenden Gase bilden oder vorhanden sind Bei Verletzungen durch gesundheitsgef hrdende Me dien bzw Gase s...

Страница 12: ...80 oder Klasse B 785x600x125 max 3 Schachtauflageringe DIN 4034 2 785x625x80 Gu Schachtabdeckung 700 Klasse A hnl DIN 19596 L ftungs Kabelleerrohr Zulauf Sp lanschlu optional Vakuumbrecher Anschlu ver...

Страница 13: ...DEUTSCH 13 Notizen Notes...

Страница 14: ...ol devices 18 2 8 Pumped fluids 18 2 9 Sound Pressure 18 3 General description 19 3 1 Application 19 3 2 Types of use 19 3 3 Construction 19 4 Package Transport Storage 20 4 1 Delivery 20 4 2 Transpor...

Страница 15: ...damages In order to ensure that your guarantee claim is processed as efficiently as possible please contact us or the appro priate sales representative Once your claim for a return has been agreed yo...

Страница 16: ...e In this installation type the product is installed dry i e the pumped fluid is delivered to and discharged via a pipeline system The product is not immersed in the pumped fluid Please note that the...

Страница 17: ...his her superior immedi ately should any defects or irregularities occur It is of vital importance that the system is shut down immediately by the operator if any problems arise which may endanger saf...

Страница 18: ...must be checked by an electrician for proper functioning before start up see the Electrical Connection data sheet Please remember that certain equipment requires a decoder device or relay to function...

Страница 19: ...onstruction Smell tight and watertight pump station with one or two pumps The pump station consists of a collecting tank with all necessary ports for the connection of inlet pipe discharge pipe and ai...

Страница 20: ...ccurring during transport and stor age The packaging should be stored in a safe place if the location used is changed frequently 4 3 Storage Newly supplied products are prepared that they can be store...

Страница 21: ...ation to 97 DPr Insert shaft then align it vertically and horizontally Install shaft cover bearing ring Topsoil clay other cohesive soils and as a rule the excavated soil are not suitable for backfill...

Страница 22: ...ine the following points must be observed The machine may only be started up by qualified personnel The safety advice must be followed at all times Every person working on the machine must have re cei...

Страница 23: ...e and the system may only be carried out by trained specialists exercising extreme care in a safe workplace Proper protective clothing is to be worn The machine must be disconnected from the electric...

Страница 24: ...85x600x80 or Class B 785x600x125 Max 3 support rings DIN 4034 2 785x625x80 Cast shaft cover 700 Class A like DIN 19596 air vent cable pipe Intake Flush cleaning connection optional vacuum breaker Scre...

Страница 25: ...English 25 Notizen Notes...

Страница 26: ...ag tijdens het bedrijf 30 2 7 Veiligheids en bewakingscontroles 30 2 8 Vloeistoffen 30 2 9 Geluidsdruk 30 3 Algemene beschrijving 31 3 1 Toepassing 31 3 2 Toepassingswijzen 31 3 3 Opbouw 31 4 Verpakki...

Страница 27: ...he eindcontrole Een door HOMA Pumpenfabrik GmbH gehonoreerde fabrieksgarantie be tekent niet dat de garantietijd wordt verlengd of dat er een nieuwe garantietijd ingaat voor de vervangen onderdelen Ve...

Страница 28: ...een vloeistof aanwezig om te verpompen Opstellingswijze nat De pomp wordt in de vloeistof ondergedompeld De pomp is compleet omgeven door vloeistof Houd rekening met de gegevens voor de max dompeldiep...

Страница 29: ...iligd tegen op nieuw inschakelen Alle draaiende onderdelen moe ten tot stilstand gekomen zijn De bediener moet elke optredende storing onmiddel lijk melden aan zijn leidinggevende Een onmiddellijke st...

Страница 30: ...draaiende onderdelen tot stilstand komen 2 7 Veiligheids en bewakingscontroles Onze installaties zijn uitgerust met verschillende veilig heids en bewakingscontroles Deze inrichtingen mogen niet worden...

Страница 31: ...ecompensatiering 800 mm Toe te passen pompmodellen TP30M TP30V TP50M TP50V TCV TCM GRP Toe te passen besturingskasten PS15 PS25 4 Verpakking transport en opslag 4 1 Aanlevering Na ontvangst moet de ze...

Страница 32: ...t een hijs werktuig voor de montage demontage kan worden gemonteerd waarmee de opstelplaats van de pomp zonder risico s bereikbaar is Het hijswerktuig moet een maximale draagkracht hebben die hoger is...

Страница 33: ...at se vakkundig worden gelast Optioneel is het moge lijk dat u de schachtverlenging reeds volledig gelast ontvangt 5 4 Opdrijfbeveiliging De SKB 6 resp SKB 9 schachten zijn voor normale toe passingssi...

Страница 34: ...ekker moeten voor gebruik op beschadiging worden gecontroleerd Het uiteinde van de aansluitkabel mag niet in water worden ondergedompeld omdat er anders water in de motoraansluitruimte kan komen Motor...

Страница 35: ...contamineerd Er moet tevens op wor den gelet dat er geen gassen worden gevormd of aanwezig zijn die schadelijk zijn voor de gezondheid Bij letsel door vloeistoffen of gassen die schadelijk zijn voor d...

Страница 36: ...f Klasse B 785x600x125 Max 3 schachtoplegringen DIN 4034 2 785x625x80 Gegoten schachtafdekking 700 Klasse A volgens DIN 19596 Ontluchtings kabelbuis inlaat Spoelaansluiting optioneel vac umbreker aans...

Страница 37: ...Nedlerlands 37 Notizen Notes...

Страница 38: ...38 Notizen Notes...

Страница 39: ...39 Notizen Notes...

Страница 40: ...edingte Kontaminierung des Ger tes toxisch nein ja welche Stoffe tzend nein ja welche Stoffe mikrobiologisch nein ja welche Stoffe explosiv nein ja welche Stoffe radioaktiv nein ja welche Stoffe sonst...

Страница 41: ...the instruments toxic no yes substance corrosive no yes substance microbiological no yes substance explosive no yes substance radioactive no yes substance other substances no yes substance Legally bi...

Страница 42: ...tourneren Contaminatie van het apparaat als gevolg van de toepassing giftig nee ja welke stoffen bijtend nee ja welke stoffen microbiologisch nee ja welke stoffen explosief nee ja welke stoffen radioa...

Страница 43: ...43...

Страница 44: ...x 49 0 2247 702 44 e Mail info homa pumpen de Internet www homa pumpen de Industriestra e 1 53819 Neunkirchen Seelscheid Telefon 49 0 2247 702 0 Fax 49 0 2247 702 44 e Mail info homa pumpen de Interne...

Отзывы: