Operating Instructions
145 146
137
A 5.58 / A 5.58 P
Maintenance during the First Period
of Operation
During the first period of operation the following services
and inspections are due:
Maintenance after the first 50 service hours
Maintenance after the first 150 service hours
Maintenance after the first 500 service hours
Maintenance after the First 50 Service hours
Checking the Engine for Leaks
-
Remove the hood.
-
Check the engine and implements for leaks.
Carry out the further services in accordance with the main-
tenance schedule. You can find the description of the serv-
ices in the maintenance schedule page reference or in the
alphabetical index.
Содержание A-Trac 5.58 P
Страница 1: ...Date of Issue 17 11 2010 Order No 153 148 OperatingInstructions A Trac 5 58 A Trac 5 58 P...
Страница 2: ......
Страница 6: ......
Страница 48: ......
Страница 62: ...A 5 58 A 5 58 P Operating Instructions 60 145 146...
Страница 112: ......
Страница 118: ......
Страница 122: ......
Страница 126: ......
Страница 134: ......
Страница 138: ......
Страница 140: ......
Страница 152: ......
Страница 160: ......
Страница 168: ......
Страница 170: ......
Страница 172: ......