HOKKIM HAMF-4 Скачать руководство пользователя страница 13

7)

Auto Start
Set the Auto-Manual-Test selector to the Auto position. Open or close the Mains Fail Contact 
(depending on your selection). Immediately the MFT On LED will light. After the set time delay, 
the following will happen simultaneously: a) The EST On and Up LED will go off. b) The Fuel 
Solenoid  On LED will light and external fuel solenoid will energize. c) The ASR begins the Crank 
and Rest cycles. Each time the Crank LED is lighted the external start relay is energize. Set the 
Crank and Rest timer as required.

8)

Fail To Start
In step No.7 do not allow  the generator to run. That is, neither the GRR or CCR should on. 
Depending   on   your   selection,   the   fail   to   start   alarm   will   be   triggered   after   the   set   number   of 
attempts. Cancel and reset the alarm.

9)

Generator Run
After the alarm has been reset the MFT will on again and attempt start the generator. This time 
switched on the CCR followed by the GRR. Once the CCR is on, the ASR is disabled and once the 
GRR is on the OPT is also on. After the set time delay the OPT up LED will light. This is the stage 
the generator is in operation and external fault sensors that was loop through the OPR can be tested.
The GRR contact is taken from an external 240VAC relay usually called the AFR (AC Fail Relay) 
connected to the generator incoming bus. The CCR contact is taken from the Speed Sensing Relay 
e.g. Hokkim TFQ-1 / M which is DC operated and speed sensing signal taken from the charger 
alternator or magnetic pickup. The CCR is for additional safety and sometimes is not used.

10) OPR Fault Simulation

Repeat steps 3, 5 & 6 with fault inputs loop through the OPR 11-14, 21-24, 31-34 & 41-44 contacts. 
Fault can only be stimulated after the OPT is up and OPR energized. It can be noted that each time a 
fault is stimulated the FMR trips , cutting supply to MFT, SDT, GRR, CCR, OPT & OPR. The EST 
will on and after the set delay, up and releases the external stop solenoid. When the stimulated fault 
is reset, the cycle will repeat with the MFT on etc. Remember, when shut down occurs, the GRR 
and CCR should open. Complete the cycle up to the generator in operation before triggering the 
next fault.

11) Automatic Shutdown

Repeat step 9 until the generator is in operation. In normal circumstances, fault does not occur as in 
step 10. What will happen is that the Utilities Supply (TNB) will return. When this happen, the 
HAMF-8 / 4 will go into the shutdown mode. To test this, set the Mains Fail Contact to the original 
position. The MFT On LED will be off and the shutdown timer On LED will light but nothing else 
seems to happen. Wait until the set time delay of the SDT and the following will occur. The fuel 
solenoid will be cut and EST on. Most probably you only use either one of them. If you bypass the 
GRR and CCR on for testing purpose, you should now off them.  This  will complete the auto 
shutdown.

12) Emergency Stop

Along various stages of testing you can test emergency stop by pressing the Emergency Stop button. 
In all cases you can see that all relay cards are disabled except the EST. In an emergency situation 
the EST is required to shutdown the generator (only if your system is energized stop).

Page 13

HOKKIM

giving you control

Control & Protection Relays

Содержание HAMF-4

Страница 1: ... show the bottom base Printed Circuit Board with labeling of terminals and plug in PCB cards We will now identify each PCB card and familiarize you with the LED indicating lights and knob adjustments Once familiarized you will be able to follow the operation of the Integrated AMF and identify problems when they occur and replace the appropriate card 1 ESR Emergency Stop Relay RUN green LED On Rela...

Страница 2: ...Page 2 HOKKIM giving you control Control Protection Relays ...

Страница 3: ...Page 3 HOKKIM giving you control Control Protection Relays ...

Страница 4: ...Page 4 HOKKIM giving you control Control Protection Relays ...

Страница 5: ...Page 5 HOKKIM giving you control Control Protection Relays ...

Страница 6: ... off the lamp output relay in the Fault Alarm Relay card Adjustment Flashing rate from slow to fast and steady 12 FAR Fault Alarm Relay LAMP amber LED On Lamp relay energized and output to external lamp ALARM red LED On Fault signal detected and alarm activated Selection Loop to next FAR or Out to FMR 13 OPR Oil Pressure Relay Provides 4 nos delay on contacts set by OPT for fault alarm signals 14 ...

Страница 7: ...Page 7 HOKKIM giving you control Control Protection Relays ...

Страница 8: ...ectable Normally Open or Normally Close T12 To Mains Fail contact selectable Normally Open or Normally Close T13 To Bell Cancel push button Normally Open T14 To Bell Cancel push button Normally Open T15 To Alarm Reset push button Normally Close T16 To Alarm Reset push button Normally Close T17 Negative supply input from battery T18 Negative supply output Internally connected to T17 T19 Positive su...

Страница 9: ...To indicator lamp No 2 corresponding to S2 L3 To indicator lamp No 3 corresponding to S3 L4 To indicator lamp No 4 corresponding to S4 L5 To indicator lamp No 5 corresponding to S5 L6 To indicator lamp No 6 corresponding to S6 L7 To indicator lamp No 7 corresponding to S7 L8 To indicator lamp No 8 corresponding to S8 TERMINALS S1 TO S8 FAULT SIGNAL INPUTS S1 To volt free fault signal contacts Norm...

Страница 10: ...You can have options of 1 2 or 4 oil pressure delay contacts TERMINALS C1 TO C8 ALARM EXTENSION C1 To Extension Fault Alarm Relay Board FARX terminal R1 For use if required C2 To Extension Fault Alarm Relay Board FARX terminal R2 For use if required C3 To Extension Fault Alarm Relay Board FARX terminal R3 For use if required C4 To Extension Fault Alarm Relay Board FARX terminal R4 For use if requi...

Страница 11: ...Examples are Low Fuel or Charger Fail The FAR allows you to set these parameters There is a switch at the bottom corner labeled Loop and Out see diagram The FARs should all be set to Loop until the last one which should be set to Out to the Fault Monitor Relay Example 1 All faults require shut down of generator Set FAR No 1 to No 7 to Loop and No 8 to Out All the red LEDs in the FAR card are on Ex...

Страница 12: ...ing from No 1 to 8 It should be noted that fault signal which is loop through the OPR contacts cannot be triggered externally When one or more fault is triggered the following should happen The FMR will trip this is only true if the fault Loop Out has not been disabled The Bell LED will light and external bell ring The corresponding Lamp LED will flash together with the external lamp The correspon...

Страница 13: ...afety and sometimes is not used 10 OPR Fault Simulation Repeat steps 3 5 6 with fault inputs loop through the OPR 11 14 21 24 31 34 41 44 contacts Fault can only be stimulated after the OPT is up and OPR energized It can be noted that each time a fault is stimulated the FMR trips cutting supply to MFT SDT GRR CCR OPT OPR The EST will on and after the set delay up and releases the external stop sol...

Страница 14: ...l thus causing it to ring on and off Four nos OPR contacts are provided but if they are insufficient you can add a relay to the Oil Pressure Timer output for additional contacts You can use the Fused ve out terminal T02 as a power source for additional controls if needed It is protected by the 10A fuse on the base PCB TROUBLE SHOOTING The HAMF 8 4 is designed in such a way that parts replacement a...

Страница 15: ...ng strike the Under Voltage Relay and cause a flash over to its relay contacts After taking care that the base PCB is not damaged trouble shooting the HAMF 8 4 is easy in the worse scenario all you have to do is to replace all the 21 16 relay cards which takes less then 10 minutes To replace any relay card you have to remove the six knobs and six mounting screws of the top face label plate After r...

Отзывы: