76
6-1
2
Maintenance
6.0 Maintenance
This unit is designed to operate for a long time.
At start-up the operator should check if all indicators
and displays light up.
If the operator shuts down correctly (Chapter 5.3) at the
end of each shift, no further maintenance is required.
This unit must not be opened by the operator, apart
from following the instructions below.
6.1
Storage
When the unit will be stored for a several weeks or
longer, prepare the unit correctly:
•
Shut down the unit properly, refer to Chapter 5.3.
•
Remove the threaded shaft from the balancer.
•
Apply a thin layer of non-corrosive oil on all threads
and cones.
•
Wrap oiled items in paper to keep the parts dust-
free.
Before putting the unit into use again, clean all oiled
parts.
6.2 Changing the mains fuse
Refer to Figure 6-1.
•
Switch off the unit.
•
Unplug the power cable from the power outlet.
•
Remove the power cable from the machine mains
socket.
•
Pull out the fuse holder.
•
Replace the damaged fuse with another fuse having
an identical rating.
•
Return the unit to its original functioning state, by
following the steps above in reverse.
..
..
..
.
.
Содержание geodyna 7100
Страница 94: ...94 Blank Page ...