Section 5A
Step 1 – Fly-bar Control arm Assembly
Locate Fly-bar Control Arm Part A & B
and attach them together using (2) M3-
8 Cap Head Bolts one for each arm
set.
Install (2) M3-4 pivot Ball Studs in each
assembly.
Step 2 – Installing Fly-bar and Control Arms
Locate the (1) M4 Fly-bar slide it thru
the Sea-saw unit on the rotor head
approximately centering it.
Locate (2) Fly-bar Control arm
spacers and slide one on each side of
the fly-bar with the ridge of the spacer
towards the bearing in the sea-saw.