
23
26
Left back cover
1
57
Red connecting line
1
27
Right back cover
1
58
Sensor wire
1
28
Lifting transporting wheel
2
59
Reed pipe for safety key
1
29
Base handling wheel set
2
60
MP3 module
1
30
Adjusting foot pad
2
61
Locating pad for side rail
8
31
Tension spring
1
TREADMILL STRUCTURE
ASSEMBLY INSTRUCTIONS
STEP 1:
Put meter on the meter tube.
Meter
Push key on the handlebar
Handlebar
Meter tube
Motor cover
Side rail
Running belt
(non slip)
Base frame
Decorating cover at base
Back cover
Safety key
Heart rate sensor
Screw M8x20
Washer
¢
8x
¢
16xT1.5
Screw M8x60
Nut M8
Содержание BE8510-i
Страница 1: ...INSTRUKCJA U YTKOWANIA MANUAL INSTRUCTION N VOD K OBSLUZE...
Страница 19: ...18...
Страница 38: ...37...
Страница 56: ...55...
Страница 58: ...57...