MAINTENANCE
7-53
Interval
(hours)
Check Points
Abnormalities
Remedies
Daily Check
Contact surfaces of
flange joints
Leak (11)
Replace
Bolts
Loose or leak (11)
Retighten or replace
O-ring
Welded surfaces on
flange joints
Leak (12)
Replace
Every 250
hours
Flange joint neck
Crack (13)
Replace
Welded surfaces on
flange joints
Crack (12)
Replace
Clamps
Missing or deformation
Loose bolts
Replace or retighten
M4GB-07-059
M4GB-07-060
12
13
12
Fig.2
13
11
Содержание ZW 120-6
Страница 4: ......
Страница 10: ...MACHINE NUMBERS 2 MEMO ...
Страница 58: ...SAFETY SIGNS S 48 MEMO ...
Страница 156: ...BREAK IN 2 2 MEMO ...
Страница 206: ...OPERATING MACHINE 5 20 MEMO ...
Страница 218: ...TRANSPORTING 6 12 MEMO ...
Страница 331: ...MAINTENANCE 7 113 25 Cutting edge mounting bolt Bolt dia in 1 Quantity 7 M4GB 07 116 ...
Страница 344: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Страница 348: ...STORAGE 10 4 MEMO ...
Страница 354: ...TROUBLESHOOTING 11 6 MEMO ...
Страница 356: ...SPECIFICATIONS 12 2 MEMO ...
Страница 360: ...13 4 OPTIONAL ATTACHMENTS HYDRAULIC TYPE QUICK COUPLER OPERATION MEMO ...