2-1
BREAK-IN
Break-in Operation for New Machine
IMPORTANT: If the machine is heavily loaded without
performing break-in operation, damage to the
machine such as seizure and/or scoring may result by
which the machine life will be remarkably shortened.
Be sure to sufficiently perform break-in operation.
Machine life and performance will be greatly affected by the
extent of operation and maintenance of the machine during
the initial operation. Perform break-in operation for the first
100 hours.
Check the machine before starting the engine.
After starting the engine, sufficiently perform warm up
operation.
Avoid sudden starting, sudden acceleration and sudden
braking while traveling the machine.
Avoid heavy load for the front attachment.
Содержание ZW 120-6
Страница 4: ......
Страница 10: ...MACHINE NUMBERS 2 MEMO ...
Страница 58: ...SAFETY SIGNS S 48 MEMO ...
Страница 156: ...BREAK IN 2 2 MEMO ...
Страница 206: ...OPERATING MACHINE 5 20 MEMO ...
Страница 218: ...TRANSPORTING 6 12 MEMO ...
Страница 331: ...MAINTENANCE 7 113 25 Cutting edge mounting bolt Bolt dia in 1 Quantity 7 M4GB 07 116 ...
Страница 344: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Страница 348: ...STORAGE 10 4 MEMO ...
Страница 354: ...TROUBLESHOOTING 11 6 MEMO ...
Страница 356: ...SPECIFICATIONS 12 2 MEMO ...
Страница 360: ...13 4 OPTIONAL ATTACHMENTS HYDRAULIC TYPE QUICK COUPLER OPERATION MEMO ...