![Hitachi RHUE-3AVHN-HM Скачать руководство пользователя страница 59](http://html.mh-extra.com/html/hitachi/rhue-3avhn-hm/rhue-3avhn-hm_installation-and-reference-manual_2139385059.webp)
Page
59
of
61
Heat pump commissioning certificate – Page 3 of 3
Operational Test Results
DHW heating time
DHW final temperature
Flow rate during DHW
Heat pump flow
temperature (DHW)
Heat pump return
temperature (DHW)
Heat pump flow
temperature (Heating)
Heat pump return
temperature (Heating)
Flow rate during
heating
HC1 flow temperature
(Heating)
HC1 return temperature
(Heating)
HC2flow temperature
(Heating)
HC2 return temperature
(Heating)
Flow rate during defrost
DHW Time settings
Period 1
Period 2
Room Unit settings
Time & Temp.
e.g. 6am & 21°C
Period 1
Period 2
Period 3
Period 4
Period 5
Period6
Commissioning
engineer notes
Operation and system controls demonstrated to customer
Manufacturers literature left with customer
Signature of commission engineer ………………………………………………………. Date………………………………………….
Customer signature …………………………………………………………………………. Date………………………………………….
Содержание RHUE-3AVHN-HM
Страница 5: ...Page 5 of 61 ...
Страница 39: ...Page 39 of 61 This page is intentionally left blank ...
Страница 43: ...Page 43 of 61 This page is intentionally left blank ...
Страница 47: ...Page 47 of 61 This page is intentionally left blank ...