– 26 –
3. MAINTENANCE AT BEGINNING OF LONG OFF PERIOD
●
Run the unit by setting the operation mode to
(COOL), the temperature to 32
°
C and the fan speed
to HI for about half a day on a fine day, and dry the
whole of the unit.
●
Switch off the power plug.
1
2
3
REGULAR INSPECTION
PLEASE CHECK THE FOLLOWING POINTS BY QUALIFIED SERVICE PERSONAL EITHER
EVERY HALF YEARLY OR YEARLY. CONTACT YOUR SALES AGENT OR SERVICE SHOP.
Is the earth line disconnected or broken?
Is the mounting frame seriously affected by rust and is the
outdoor unit tilted or unstable?
Is the plug of power line firmly plugged into the socket?
(Please ensure no loose contact between them).
Air
Blow
Cleaning and maintenance must be carried out only by qualified service personal. Before cleaning,
stop operation and switch off the power supply.
!
CAUTION
Confirm
Содержание RAC-65NH5
Страница 36: ...CIRCUIT DIAGRAM 37 ...
Страница 37: ...CIRCUIT DIAGRAM MODEL RAC 65NH5 39 ...
Страница 87: ... 99 SELF DIAGNOSIS LIGHTING MODE ...
Страница 89: ... 101 2 Outdoor unit does not operate but receives remote infrared signal ...
Страница 91: ... 103 6 Check the main P W B power circuit ...
Страница 92: ... 104 CHECKING THE REMOTE CONTROLLER ...
Страница 97: ... 109 ...
Страница 103: ... 115 PARTS LIST AND DIAGRAM INDOOR UNIT MODEL RAK 65NH5 2 1 9 7 8 6 19 20 3 11 4 5 10 13 15 14 17 16 12 22 26 18 27 ...
Страница 107: ...HITACHI PM NO 0000E Printed in Malaysia RAK 65NH5 RAC 65NH5 ...