Problem
Recommended action
•
Verify that the settings for the target being
monitored are correct.
Related topics
•
Troubleshooting related to remote path status on page 9-3
•
Procedure for recovering pinned track of a GAD volume on page 9-16
Troubleshooting related to remote path status
Remote path
status and
description
Status description
Recommended action
Normal
Normal
This remote path is correctly set,
and the path can be used for
copying GAD.
The remote path status is normal.
Recovery is not required.
Initialization
Failed
Initialization
error
A physical connection between
the local storage system and the
remote storage system, or a
connection between the local
storage system and the switch
does not exist. Therefore, the
error occurred when the
connection to the remote storage
system was initialized.
Check the following, and correct
them if they are not correct:
•
The cable between the ports of
the local storage system and
the remote storage system or
between the ports of the local
storage system and the switch
of the local storage system is
properly connected.
•
The serial number (S/N) and
system ID of the remote
storage system, the port
number of the local storage
system, and the port number
of the remote storage system
are correct.
•
The topology (Fabric, FC-AL,
Point-to-point) of the ports of
the local storage system and
remote storage system is
correctly set.
Communication
Time Out
Communication
timeout
A timeout occurred in a
communication between the local
storage system and remote
storage system.
Check the following, and correct
them if they are not correct:
•
The remote storage system is
powered on, and the remote
storage system can be used
normally.
•
The following network relaying
devices are correctly
configured, and can be
properly used:
¢
Connectors
Troubleshooting
9-3
Hitachi Virtual Storage Platform G1000 Global-Active Device User Guide
Содержание G1000
Страница 8: ...Index viii Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 14: ...xiv Preface Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 60: ...2 22 System requirements Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 80: ...3 20 Planning for global active device Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 128: ...4 48 Configuration and pair management using CCI Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 238: ...9 18 Troubleshooting Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...
Страница 245: ...Hitachi Virtual Storage Platform G1000 Global Active Device User Guide ...