
30
CP-X444(C11XMB)/CP-X440(C11XM25)
7. Wiring diagram
Wiring diagram 1
Wiring of the power supply units
Wiring of the circuit power unit
(1) Connect CNPW1 and TSW, attach FEB4 to CNPW1 and
#6800, and secure the SK binder
(2) Wire the AC lead
(3) Connect the CNPWR, attach FEB1
FEB1
Important
Attach the FEB1 (ferrite core) to CNPWR, leave
it on the same side as the CN101.
When
attaching
the
CNPWR
connector
to
CN101,
make sure it locks in place completely.
CN101
C107
AC
lead
Earth
lead
Make
sure
the
AC
lead
passes
under
FEB1.
(In
order
to
prevent
pinching
when attaching the ballast holder.)
CNPWR
Make sure the earth
lead
passes
over
the insulation sheet
CN102
CN103
Circuit
Power unit
Insulation sheet
5 to
10mm
Attach
FEB4
(ferrite
core)
to
CNPW1
and
#6800.
Leave
it
at
a
5
to
10mm
distance
away
from
CN102.
Then
secure
the
TSW,
CNPW1,
and
#6800
cables
with
the
SK
binder so that FEB4 (ferrite core) cannot be
shifted.
Confirm
that
the
core
is
not
pinching
the
cable, and that it is securely locked in place.
Important
The
TSW
and
#6800
cables
on
top
of
the
power
supply
board
should
never
sag
(Otherwise,
wiring
operations will not be possible in the manufacturing
process afterwards due to insufficient wire length)
Make sure the #6800 cable passes the inside of the
power supply case.
FEB4
ZSK
TSW
#6800
CNPW1
Confirm
that
CN102
and
CN103
are securely connected (It will not
be possible to confirm this in the
manufacturing process later)
Wiring of the ballast power unit
(1) Connect and wire the CNBAR
(2) Wire the igniter lead, attach the FEB3
Operations with instructions are areas that
have implications with laws/standards. It is
possible
to
be
in
violation
of
these
laws/
standards
in
the
case
that
these
opera-
tions
are
not
carried
out
according
to
the
instructions.
Assemble
according
to
the
operation instructions.
Important
Make sure the igniter
lead
passes
through
the clamp of the bal-
last holder
FEB3
Attach
FEB3
(ferrite
core)
to the igniter lead
CNBAR
Confirm that CNBAR is securely connected.
(It
will
not
be
possible
to
confirm
this
in
the
manufacturing process later)
Pass
the
cable
through
the
cutout
portion
of
the ballast holder.
Ballast
Power Unit
CN2
Содержание C11XM25
Страница 36: ...36 CP X444 C11XMB CP X440 C11XM25 8 Disassembly diagram ...
Страница 37: ...37 CP X444 C11XMB CP X440 C11XM25 ...
Страница 54: ...54 CP X444 C11XMB CP X440 C11XM25 MEMO ...
Страница 55: ......
Страница 70: ...MEMO ...
Страница 72: ...QR64691 Digital Media Division Printed in Japan JE CP X444 CP X440 YK No 0555 ...