HANDBOOK REVISIONS 
 
REV DATE 

NAME  DESCRIPTION 

06/15/00 

CSH 

Create Word .DOC file from 056-065-060-005 Operator’s 
Handbook. 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

Содержание PAT EI65/0005

Страница 1: ...HIRSCHMANN LENGTH ANGLE RADIUS LOAD INDICATING SYSTEM EI65 0005 OPERATOR S MANUAL P N 056 065 190 005 Rev C 6 15 00...

Страница 2: ......

Страница 3: ...for a particular purpose PAT shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing performance or use of this manual This docume...

Страница 4: ......

Страница 5: ...iguration of the Crane 10 4 2 1 Setting of Reevings 13 4 2 2 Selecting the Hoist Winch 13 4 3 Activating and Setting of Preset Limits 14 4 3 1 Setting of Boom Length Presets 14 4 3 2 Setting of Boom A...

Страница 6: ......

Страница 7: ...g and calibration information Always refer to operational instructions and load charts provided by the crane manufacturer for specific crane operation and load limits 2 WARNINGS The EI65 is an operati...

Страница 8: ...on After ignition of the engine the system starts with an automatic test of all lamps the audible alarm and the complete system After the system has passed through the system test without errors the s...

Страница 9: ...c doc 3 Figure 1 PAT System EI65 Components of the Telescopic Crane 1 Console 2 Cable Reel 3 Linerider or Force Transducer 4 A2B Switch The load sensor depends on the system and crane options Refer to...

Страница 10: ...oc 4 Figure 2 PAT System EI65 Components of the Lattice Crane 1 Console 2 Cable Reel 3 Linerider or Force Transducer 4 A2B Switch 5 Angle Sensor The load sensor depends on the system and crane options...

Страница 11: ...The operating console is located in the operator s cabin in front of the operator This unit contains different displays and controls which are described in Section 3 3 Figure 3 Operating Console 1 Ove...

Страница 12: ...rm light in the button Horn Off 5 will light up The following crane movements will be stopped simultaneously hoist up telescope out boom down Option 3 Limit Alarm Light The Limit Alarm Light 3 will li...

Страница 13: ...setting the reevings and selecting the hoist winch is described in Section 4 2 8 Limit Button The button Limit 8 is used for activating the setting procedure of the preset limits The limits are define...

Страница 14: ...ing procedure of limits and operating conditions 13 Data Display The Display 13 will show technical information as well as operating information and instructions for the operator 120 0 112000l bs 88 5...

Страница 15: ...ith the actual crane configuration If there is a difference between the indicated and the actual condition the operator must correct those values by completing Steps 1 to 15 in Section 4 2 The system...

Страница 16: ...pped with a boom extension If the crane is equipped only with a main boom without jib or boom extension the OK 10 button has to be pressed Step 5 to 9 will be skipped when the button OK is pressed Ste...

Страница 17: ...by pressing the OK 10 button Step 9 The display shows the previously programmed or default offset of jib 2 Enter a new jib offset using the UP 12 or DOWN 11 buttons Confirm jib 2 offset by pressing th...

Страница 18: ...to review the selection made in the programming procedure press OK 10 button The display will show jib length and offset check correct and press OK If no jibs were selected the Exit screen will appea...

Страница 19: ...n OK 10 the procedure for Number of Reevings is completed The operating screen will be displayed which shows the measured crane data Complete Section 5 PRE OPERATION INSPECTION to ensure the data show...

Страница 20: ...on option When the system is longer than 2 hours without supply voltage the preset values may be lost and will reset to the to the maximum or minimum limits To activate a preset limit press the LIMIT...

Страница 21: ...l through the limits To set a minimum and maximum boom angle limit press the OK 10 button Step 2 The minimum boom angle preset value is displayed use the UP 12 and DOWN 11 buttons to change the displa...

Страница 22: ...us presets are displayed If the values are incorrect press OK 10 button and restart the limit preset procedure Pressing OK will store the preset values and return to the working screen 4 3 4 Setting o...

Страница 23: ...um boom load preset value is displayed use the UP 12 and DOWN 11 buttons to change the displayed value to your desired limit Pressing OK will store the preset value and return to the working screen 4...

Страница 24: ...on properly by lighting the red warning light sounding the audible alarm and locking the dangerous crane movements a Check the anti two block alarm light 2 and the audible alarm by manually lifting th...

Страница 25: ...lues an authorized PAT service representative shall be called for repair of the system and or verification of the crane s calibration Any structural modifications or changes to the crane shall require...

Страница 26: ...hanical parts and cables all other repairs shall be performed by PAT Authorized Service Representatives 8 TROUBLESHOOTING In case of a malfunction of the system a code that identifies the system malfu...

Страница 27: ...n aux Hoist 71 Limit Length Main Boom Max Decrease length limit 72 Limit Length Main Boom Min Increase length limit 73 Limit WG Main Boom Max Decrease main boom angle 74 Limit WG Main Boom Min Increas...

Страница 28: ...Operator s Manual EI65 0005 PAT Rev C 06 15 00 CSH 056 065 190005_c doc 22 HANDBOOK REVISIONS REV DATE NAME DESCRIPTION C 06 15 00 CSH Create Word DOC file from 056 065 060 005 Operator s Handbook...