background image

HermanMiller

Assembly Instructions

9

1BPGDV rev C

Step 8

8.1 Align 12” Shared Peninsula Leg to End Leg
- Verify no gap between 12” Shared Peninsula Leg and End Leg.
8.2 Shift Leg/Modesty Assembly and Peninsula Work Surface 

within the slots to achieve no gap conditions.

Step 10

10.1 Attach remaining #14 screws to secure 12” Shared 

Peninsula Leg to Main Metal Desk Work Surface (1/8” pilot holes 

recommended).

No gap

12” Shared 

Leg 

(FK2E3)

End Leg

(FK2E3)

Step 9

9.1 While maintaining work surface flushness & no gap, attach the 

FK29B Ganging bracket to the Peninsula Work Surface (1/8” pilot holes 

recommended).

Ganging bracket

(FK29B)

Disassembly and Recycling:

Materials Identification and Segregation:

Where possible, plastic components are marked with ASTM recycling 
codes. Use these codes to identify material type for recycling. Non marked 
components should be treated as mixed plastic. Ferrous metals can be 
identified using a small magnet for recycling. Non-ferrous metals should be 
separated and recycled separately.
To disassemble product, reverse the above installation steps.

Содержание Canvas Office Landscape Metal Desk

Страница 1: ...0 X 1 2 Pan Head Sheet Metal Screw varies 10 12 x 3 4 Pan Head Screw varies 10 12 x 3 4 Pan Head Screw varies 1 8 Drill Bit Safety Glass 1 1 Assemble Legs to Modesty Panel with 8 Pan Head Sheet Metal...

Страница 2: ...dard screw is 10 X 3 4 long 2 6 While maintaining downward force insert screws Start from center work outward alternating sides Install screws in all available holes in stiffener Step 2 10 Pan Head Sc...

Страница 3: ...raddle work surfaces 3 3 Drill pilot holes into work surface 3 4 Secure Leg Assembly to Work Surface with 3 14 Pan Head Screws Shared Leg Assembly FK2E3 14 Pan Head Screw Modesty Panel FK700 Pan Head...

Страница 4: ...Screw 6 1 Position Modesty Panel to back of leg assemblies 6 2 Secure to legs with 8 Pan Head Sheet Metal Screws Modesty Panel FK700 Pan Head Sheet Metal Screws Work Surface FKS21 FKS22 or FKS23 Corne...

Страница 5: ...holes into work surface 4 3 Secure Leg Assembly to Work Surface with 3 14 Pan Head Screws Shared Leg Assembly FK2E3 14 Pan Head Screw Step 5 5 1 Place Shared Leg Assembly or End Leg Assembly shown on...

Страница 6: ...into work surface 8 3 Secure Leg Assembly to Work Surface with 3 or 6 14 Pan Head Screws Leg Assembly FK2E3 14 Pan Head Screw Step 9 9 1 Position assembly onto shared leg of first desk assembly 9 2 Dr...

Страница 7: ...edge 2 2 Drill 1 8 pilot holes centered in slots of the End Leg brackets 3 4 deep max do not drill through top of Work Surface 2 3 Using qty 2 14 screws attach the End Leg to the Work Surface in the e...

Страница 8: ...leg will slide under the main work surface when attaching the peninsula surface steps 7 8 5 1 Adjust the Leg Levelers to the same height as Levelers on the main Work Surface Leveler 1 8 Pilot hole St...

Страница 9: ...nd Leg FK2E3 Step 9 9 1 While maintaining work surface flushness no gap attach the FK29B Ganging bracket to the Peninsula Work Surface 1 8 pilot holes recommended Ganging bracket FK29B Disassembly and...

Отзывы: